This lecture provides an overview of what a construction programme is, why they are necessary and some of the tools available to produce and manage construction programmes.
This lecture provides a detailed explanation of planning terminology that will be used throughout the course.
Getting started with planning and where to start when producing programmes. It covers some good and bad practice aswell as some important key points to remember when producing a construction programme.
This lecture covers the ways durations and sequencing can be determined depending on the level of information known at the time.
This lecture provides an overview on the aspects needed for a tender programme including some good practice points to help stand out in a competitive tendering situation.
This lecture covered the content required to produce a weekly programme. Examples of programmes are discussed including good practice which could be followed to improve programme management.
This lecture provides the contract requirements [NEC3] of a monthly programme including some common issues and how these can be resolved. An updating checklist is also provided to allow a regimented updating procedure for monthly programmes.
In this lecture we will cover what an Hour by Hour programme is used for, the level of detail they should cover and some good practice that should be used when they are developed.
This lecture covers important presentation methods that can be used depending on the target audience. It covers examples of each presentation technique discussed and covers some key points to follow when presenting any programme information.
This lecture covers what an efficiency review is, how to conduct one and the benefits they can bring to monitoring programme activities.
This lecture covers the monitoring of programme by measuring key predetermined metrics. It covers examples of metrics that can be measured to monitor and report on programmes and includes ways of presenting the information.
This lecture covers what a construction reliability report is, how to undertake one and the benefits they bring to assist in monitoring a programme. An example is examined to help show how trends of information can be assessed to highlight areas of concern that may otherwise continue unnoticed.
This lecture concentrates on the types of change encountered in construction and the methods that can be used to assess the impact to the programme.
This lecture covers the purpose of a What-If programme and what factors should be considered while producing one.
This lecture covers key considerations required when assessing change to a construction programme including measures to mitigate delay.
This lecture follows on from mitigation and shows the difference between mitigation and acceleration. It also covers what acceleration means from a contractual perspective and some of the key points that need to be remembered.
This lecture now concentrates on the contractual requirements [NEC3] of a programme and how elements of a programme may be manipulated to alter the actual critical path of the project.
In this lecture we cover the contractual [NEC3] reasons for programme rejection as well as several misconceptions surrounding programme acceptance.
This final lecture highlights further areas of an NEC3 contract to be aware of surrounding programme. It also covers tips when dealing with subcontract programmes.
Improve your understanding and knowledge of construction programmes and the points to follow when producing, reviewing and maintaining a programme through the construction process. Learn more than how to use planning software and develop the key skills to understand how programmes should function including some of the common mistakes made within the industry and how to overcome them.
The training has been broken into 5 sections which develop in complexity as they progress.
Section 1 (Introduction to Construction Programmes) contains 4 modules,
1. The Importance of Programmes,
2. Terminology,
3. Planning Basics,
4. Sequencing & Durations.
Section 2 (Tender & Delivery Programmes) contains 5 modules,
1. Tender Programmes,
2. Weekly Programmes,
3. Monthly Programmes,
4. Hour by Hour Programmes,
5. Presentation Methods.
Section 3 (Programme Monitoring) contains 3 modules,
1. Efficiency Reviews,
2. Key Performance Indicators,
3. Construction Reliability Reports.
Section 4 (Change Management) contains 4 modules,
1. Impact of Change,
2. What-If Programmes,
3. Change Programmes,
4. Acceleration.
Section 5 (Reviewing Programmes) contains 3 modules,
1. Programme Compliance,
2. Acceptance and Rejection,
3. NEC Best Practice
This course will assist Contractors, Sub-Contractors, Consultants & Clients develop the skills needed produce, manage, maintain and review construction programmes. This course does not teach you how to use planning software, instead it teaches you how a programme should be produced, maintained and reviewed.
All of the information provided is based on practical implementation of programmes from an operational and delivery perspective. Different methods of planning and presentation are taught to allow you to improve the communication and presentation of the construction phasing and programme. These additional skills will ease understanding of the plan to a wider audience.
Not only does the course cover the fundamentals to be included within each type of construction programme but also the best ways to monitor the programme and some examples of ways programme slippage can be mitigated. The course covers contractual terminology referencing the NEC suite of contracts however the best practice and planning management skills will be transferable across many other types of contract.
The course is aimed at beginner and intermediate students, those with an expert level knowledge of programme management and project controls would not gain from this training.