
Fundamentals
Introduction to the course
Outline of course
This is an overview of what you will learn in the projects section.
How to create a new project in VoiceQ
How to load up a pre-existing project from a local device
How to download and use VoiceQ Cloud projects
Download and load VoiceQ cloud projects in VoiceQ, sign up, log in, and import. Understand manager and collaborator roles and how to save and view English and French scripts.
Import media files, use project settings, match the time code, and select the appropriate audio for your timeline.
Import media into VoiceQ by dragging the video from the VoiceQ Kadima folder to the timeline, select the correct video and audio track, and adjust time codes.
Explore project settings to manage media files, frame rate options from 23.976 to 60 fps, start-time adjustments, audio track selection, and adding languages.
Learn character management by filtering characters, editing character information, and exploring other options such as Colores.
Master character management using simple dropdown filters or advanced multi-character filtering to view only lines for selected characters, with color-coded separation and the option to hide lines in playback.
Explore global and project-specific preferences in VoiceQ training for directors, and learn to save, import, and export custom preference profiles across all projects and voice queue.
Save profiles from current selections using the plus icon and a name. Update, import, export, and set the default for new projects; restore factory default.
Connect to a digital audio workspace, manage recording and voice workflows, and use the applications and recording system in a DIY setup.
Record with a daw and VoiceQ using networked voice cues, filter the character, queue lines, and edit timing in real time.
What is VoiceQ?
VoiceQ is a comprehensive suite of native and cloud applications used for media localization, including Automated Digital Replacement (ADR), Audio Description (AD), Lip Sync Dubbing, Closed Captioning (CC), and Voice Over (VO). These applications are designed to improve accessibility, efficiency, quality, and sustainability across the production pipeline.
VoiceQ Writer for Directors
The recommended application for Directors is VoiceQ Writer, a macOS desktop application used in pre-production as a script preparation and adaptation tool. It allows for the refinement of localized dubbing scripts before recording begins.
Functionality: It provides directors with a single, current “record-ready” script view that includes character/scene structures, line status (draft/review/approved), and notes for performance intent and pronunciation.
Collaboration: It integrates with VoiceQ Pro to keep recording sessions moving by reducing script ambiguity and aligning the cast, engineer, and client on the same version with traceable, on-the-fly updates.
Workflow Stage: Primarily used for script review, finalization, and in-session script guidance.
Key Benefits
Team Capability and Scalability
Sets an industry baseline standard for required technical skills.
Improves recruitment by attracting higher-quality candidates.
Accelerates implementation time for new staff and improves overall scalability.
Time and Cost Savings
Pre-record Workflows: 25% to 66% savings in time.
Recording Workflows: ~30% savings in time.
AI Integration: ~82% decrease in script adaptation time compared to manual workflows.
Financials: ~25% savings in both pre-record and recording costs.
Project Efficiency and Quality
Better than 20% improvement in turnaround time from script prep to recording and delivery.
Fewer missed cues, smoother navigation, and improved in-session efficiency.
Enables fast script and music adaptation while synchronizing text and lyrics to each scene.
Allows directors to focus on voice talent performance rather than technical logistics.
Supports scene-based recording for more natural performances.
Quality Control and Enterprise Power
Full compliance with OTT/SVOD quality control standards for both on-premise and remote workflows.
Increases bidding success for Tier 1 project work.
Proven results for major facilities supporting delivery of over 30,000 minutes per annum with gross margins exceeding 30%.