
Explore how the manufacturing process planner enables design and manufacturing teams to develop, validate, and optimize EBOM/MBOM based process plans, and generate work instructions across the end-to-end lifecycle.
Explore Teamcenter manufacturing basics with the manufacturing process planner (MPP): load product structures, configure product and process plans, link tools and stations, validate with process simulate, and generate work instructions.
Explore the basics of Teamcenter manufacturing process planner (MPP) through a hands-on session, covering login, navigation, favorites, project structure, graphics, variants, and perspectives.
Learn how to create and manage the manufacturing bill of materials (mbom) from ibom, link embalm structures, and perform alignment and accountability checks while configuring variants in Teamcenter.
Create and configure an mbom in the manufacturing process planner by building a skeleton, populating parts, linking structures, validating with alignment and accountability checks, and configuring variants.
Explore classification in Teamcenter, including the hierarchy of groups and classes, Ikos, and a dictionary of attributes to store, search, and reuse tools and resources via Resource Manager.
Create a classification hierarchy in classification admin, add the General Assembly group under the Manufacturing Resource Library, and define tool classes with attributes and dictionary entries for effective resource classification.
Create and configure a plant structure in MPP by defining work areas, lines, and stations, adding tools and resources from classification, and applying graphic transformation to position 3D data.
Create and connect plant structures in Teamcenter manufacturing process planner, build work areas and stations from templates, manage resources, and verify in the graphics viewer.
Explore process planning in Teamcenter manufacturing process planner by creating process structures and operations, sequencing flows, assigning parts and resources, linking product structures, and performing accountability checks.
Create and sequence a manufacturing process plan in Teamcenter manufacturing process planner MPP, from embalm to block, crank, pulley, and pump assemblies, using flows, graphics viewer, and accountability checks.
Link the process plan to plant structures by associating work areas to operations in Teamcenter MPP, and assign classified and unclassified resources to each operation.
Link the plan to the process and assign resources to operations. View the plant in the 3D graphics viewer to confirm station connections and occurrence types.
Manage time information across processes, operations, and activities in Teamcenter MPP by estimating, refining with simulation or actual data, creating activities, and generating time analysis and reports.
Create and manage activities using the activities view and time view. Assign resources, populate time data, and analyze the critical path in process gantt.
Modify process plans by creating new revisions, cutting, copying, pasting operations, and managing attachments, properties, and resources; then create structures from templates to standardize processes.
Configure and revise manufacturing process plans in Teamcenter by creating operations from templates, configuring variants, and updating sequences for engine BOMs and blocks.
Generate work instructions from process plans in Teamcenter manufacturing process planner using html reports, 3d pdf, and Visio templates, sharing assets with shopfloor, procurement, and logistics.
learn to create and bind Teamcenter work instructions for a block assembly process using Visio, text, image, and table placeholders, and generate html and 3d pdf reports.
Explore collaboration context concepts in MPP, including CC objects, structure contexts, and configuration contexts, plus revision and variant rules, then practice top-down and bottom-up creation with CC commands.
Learn to create and manage collaboration contexts in Teamcenter manufacturing process planner (MPP): save as new collaboration, create and move structure contexts, load and review product, process, and configuration contexts.
Explore in-process assembly (ipa) and dynamic ipa in Teamcenter manufacturing process planner, including legacy ipa, dynamic ipa, and creating or updating assembly trees for station parts.
Learn to create and reuse manufacturing process templates in Teamcenter MPP, configure cloning rules, classify templates, and generate and visualize in-process assemblies (IPAs) within dynamic and assembly trees.
Explore enterprise bob concepts, including generic bob, product bob, and plant bob, with partitions, logical designators, tool requirements, and logical assignments for scalable enterprise bop process planning.
Engage in hands-on practice with teamcenter manufacturing process planner to create and link generic BOPs and product BOPs, assign parts, set logical designators, and generate tool requirements and operations.
Link enterprise bob structures to create plant bob, allocate processes and operations from product bob to plant bob, and resolve tool requirements for automatic allocation.
Learn to create and link plant and project BOPs, set up buildings and process areas, allocate stations and lines, clone operations, resolve tool and part assignments, and perform accountability checks.
Balance a continuous production line by assigning times, tasks, and workers to stations, optimize cycle time and constraints, and generate line balancing reports in Teamcenter MPP.
Create line balancing constraints, connect stations with Perth, allocate operation times, and run consistency checks to generate line balancing charts and Excel reports.
Create a production program structure, define product variance, and set production rates to balance a mixed production line, then apply the program to line balancing and review charts and reports.
Create a production program collection, define product variants (engine V8 and engine V6), apply variant rules and production rates, then balance the line and perform constraint checks.
Explore structure search within loaded structures to improve performance, refine results with item attributes and classification properties, save and rename safe searches, and grant access in MPP's structure view.
Manufacturing Process Planner allows design and manufacturing engineers to concurrently develop product and Manufacturing planning.
In this course we will focus on creating and managing manufacturing data. We start with Engineering Bill of Materials and then create Manufacturing Bill of materials and then Bill of Process, Bill of Equipment and explore the enterprise Bill of Process and Logistics planning.
Process Planners will use the following features to create the Process Plans.
- MBOM: Manufacturing Bill of Materials (MBOM), which is usually created by Engineering Bill of Materials (EBOM).
- Plant Structure (BOE) : Need to create the Bill of Equipment, which is the digital Plant Structure.
- Resources: Create and manage the necessary Tools and Resources in Classification and Resources Manager
- Assignments: Assign Product, Plant, Tools to Process and Operations.
- Time Management: Create activities and create time for each operation and activities and perform Time Analysis
- Work Instructions: Generate the Work Instructions using HTML reports, 3D PDF and EWI
- Enterprise BOP (eBOP): Create and Manage the Enterprise BOP Structures - Product BOP, Plant BOP.
- Line Balancing: Balancing the Line is a critical activity on the process optimization process.
- Production Planning: Enterprise BOP features helps planners to simulate the Production Planning scenarios.
This is a intermediate level course, for better understanding the course material, it is must to have completed the Teamcenter Basics and Teamcenter engineering course.
Teamcenter Manufacturing Process planner has complete features top create and manage process plans for almost all industry verticals.