Substation Fundamentals Complete Understanding
What you'll learn
- Learn about Purpose of Electrical Substations.
- Understand the Difference between Circuit Breaker and Fuse/ Isolator.
- Understand the Power Transformers in Substations.
- Understand Circuit Breaker, Isolator, Earth Switches in Substations.
- Understand Protection Relays Basics
- Understand the Usage of Lightning arrester.
- Learn about the Instrumental Transformers including the current and potential or voltage transformer.
- Understand the Isolators and Bus bars in Power system.
- Understand Busbar Schemes
- Walk Through Visit of Substation, Know how to identify substation Components
- Learn about Substation Single Line Diagram
- Learn about Substation interlocking
- Learn about Capacitor Banks.
- Learn about Neutral Ground Resistors
- Learn about Switch Gears
- Learn about GIS Gas Insulated Substation
- Learn About AIS Air insulated Substation
- Learn about Equipment Grounding and its Purpose.
- Learn about Power System Grounding and its Target.
- Learn about the Relay and its difference compared to circuit breaker.
- Learn about the Circuit Breaker Mechanism
- Learn about the GIS Gas Compartment
- Learn about the MV SWGR Explain by 3d Simulation
- Learn about the Transformer Basics, Construction, Working Principle
- Learn about the Transformer Radiator, Fans
- Learn about the Transformer Oil & Winding Temperature Indicators
- Learn about the Transformer Pressure Relief Device
- Learn about the Transformer Name Plate & GA Drawings
- Learn about the Transformer Oil Level Indicator
- Learn about the Transformer Short Circuit & Open Circuit Test
- Learn about the Transformer Bushing
- Learn about the Transformer Maintenance
- Learn about the MV SWGR HRC Fuses
- Learn about the MV SWGR Voltage Detecting devices
- Learn about the MV SWGR Interlocking
- Learn about the MV SWGR Maintenance
Requirements
- Passionate to learn
- Anyone who wants to learn about Electrical Engineering Power Systems.
Description
Description
We have covered following topics in this training
· What is Substation
· Function of Substation
•Transmit Power
•Step Up of Down Voltages / Current
•Switching
•Metering
•Power Dispatching & Control
•Isolating Faulty Parts, Load Shedding
•Reactive Power Compensation
· Types of Substation
•Transmission Substation
•Distribution Substation
•Collector Substation
•Converter Substation
•Switching Substation
•Mobile Substation
· How Substation Work
· Components of Substation
1.Power transformer or distribution transformer (depending on substation type)
2.Circuit breakers
3.Disconnecting switches
4.Earthing Switches
5.Busbars
6.Capacitor Bank
7.Current transformers
8.Potential transformers
9.Lightening arrestor
10.Protective relays
11.Station batteries
12.Earthing system
· Introduction to Substation Single Line Diagram
· Substation Interlocking
· Walk Through Video of Substation, where you can see virtually all Substation Equipment and Identify C.T,V.T, Transformer, Breaker, Control & protection panel, battery room, charger and much more. It is like you visit substation yourself exciting.
· Explained Why AC is used over DC for Generation, Transmission and distribution
· Auxiliary Transformer
· Medium Voltage Capacitor Bank
· Neutral Ground Resistor (NGR)
· Types of Protection Relays installed
· GAS INSULATED SUBSTATION , CT,VT, CB, Isolator, Earthing Switch
· GAS INSULATED SUBSTATION SURGE Arrestor, Gas Compartments
· Demonstration How to Checkc CT. VT Wiring in Substation Actual site video
· Live captured 230kV Operation of Isolator
· Substation Interlocking Explained, When CB can be operated ??
· Brief Introduction of Substation Busbar Schemes
· Visit of Surge Arrestor Manufacturing Factory Hubbell Power System, Showing Manufacturing process, material used, testing of Surge Arrestor
· Site Visit and Actual Circuit Breaker Visit showing different components of CB
· A Walk Through Power Transformer . showing & identifying components
Medium Voltage Switch Gear
· Introduction of MV SWGR
Introduction to MV SWGR is divided in four compartments
· MV SWGR Cable Compartment
· MV SWGR CB Compartment
· MV SWGR Compartment
· MV SWGR Busbar Compartment
· Operation Maintenance of SWGR, Interlocking
· Msc Item of SWGR
MV SWGR in Detail
· MV SWGR CIRCUIT Breaker
· CB Mechanical Operation
· CB Stored Energy Principle
· CB IEC Rating
· •Rated voltage, Ur (kV)
•Rated lightning impulse withstand rating, Up (kV)
•Rated frequency, fr (Hz)
•Rated current, Ir (A)
· •Rated short-time withstand current, Ik (kA)
•Rated short circuit duration, tk (s)
•Rated peak withstand current (kA)
•Rated short circuit breaking capacity, Isc (kA)
•Transient recovery voltage, TRV
•Rated TRV (Uc) for circuit breakers intended for use on cable systems (Class S1)
•Rated out-of-phase breaking current, Id (kA)
•Rated capacitive switching currents
· MV SWGR CB Compartment in detail
· MV SWGR Componets
· MV SWGR Mimic
· CB Trolley
· CB Trip Coil
· CB Closing Coil
· CB Closing Spring
· CB Tripping Spring
· CB Latch
· CB Push button Operation
· CB AUX contacts
· CB Vacuum bottle
· CB Terminal Types
· CB Interrupter Unit
· CB Trip Free Mechanism
· Tulip, Jaw type Contact
· VCB Contact Shapes
· CB Mechanism
· Anti Pumping Relay
· Three Position Switch
· Name Plate in Detail
· Current Trasformer
· CT Name Plate
· CT IEC Standards
· Types of CT
· CT Primary & Secondary Data
· Installation drawing of CT
· CT Magnetization Curve , Saturation Region, Linear Region
· VT in detail
· Types of VT
· VT name plate
· VT IEC standards
· VT Primary & Secondary Data
· Cable Compartment
· Cable Sealing End
· Cable insulators
· Type of Cable Compartment ( For Transformer, Feeder, Ring Main)
· How Phase sequence is shown
· Selection of Cable Sealing End
· 1 Core & 3 Core Cable Sealing End
· HRC High Rupturing Capacity fuse assembly
· HRC on Mimic
· HRC Fuse Feature, Mode of operation
· HRC Fuse Selection
· Busbar Compartment
· Busbar Compartment IEC Rating
· How to identify phase sequence in busbar compartment
· VT,CT Connection at BB compartment
· LV Compartment
· Protection relays, auxiliary relays, control, alarm
· Voltage detection system
· For voltage detection according to IEC 61243-5 and VDE 0682 Part 415 with the following
voltage detecting systems:
• LRM plug-in sockets
• VOIS+, VOIS R+ (option)
• CAPDIS -S1/-S2+ (option)
• WEGA 1.2/2.2 (option)
· Accessories of MV SWGR
· Interlocking of MV SWGR
Power Transformer
· Basics
· Construction & Symbols
· Magnetic Coupling , Electrical Coupling, Step Up Step Down Transformers
· Impedance and isolating Transformers
· Losses in Transformer Copper , Core Loss, Hystersis Loop
· Buchholz Relay in Detail , Main and Conservator Tank
· Pressure Relief Device
· Transformer Silica Gel and it maintenance
· GA Drawings of Transformer
· Transformer Rating Plat 26MVA
· WTI and OTI , Winding Temperature & Oil Temperature Indicator
· Oil Level Indicator
· Short Circuit and open circuit Test of Transformer
· Bushing of Transformer HV MV
· Radiators of Transformer
· ranformer Name Plat , Main Characteristics
· Power Transformer Maintence
· Power Transformer MCQs
Wish you best of luck
Best Regards
M.Kashif
Who this course is for:
- Who like to learn about substation with practical examples
Course content
- Preview09:47
- 01:45Introduction
- 04:51Why AC not DC Answer
- 12:22AC DC Explain Further
- 02:0921 Aux Transformer
- 14:0322 Substation Batteries
- 04:4129 MV Capacitor Bank
- 02:4430 NGR
- Preview04:49
- 07:4132 GIS Explained CT VT Isolaor Earth Switch, Gas Compartments and CB
- 05:0933 HV GIS Surge Arrestor and Gas Compartments
- Preview07:39
- 03:37Checking C.T and V.T
- 01:07Opening 230Kv Air Disconnect switch
- 06:14Substation Interlocking explained
- 07:54Brief Introduction to 132kV Busbar Schemes
Instructor
Total 16 plus years of Experience in Electrical Grids / Substations. I have lead & completed 20 substation projects. Worked at 380/132/11kV Voltage Levels in Saudi Arab and 500/220/132/11kV Substation in NTDC Pakistan. I started my career from NTDC pakistan where I served at protection engineer at 500/220/132/11kV Substation Jamshoro & 132/11kV substation Vehari and I also completed 36 weeks long protection & instrumentation training in Lahore & Tarbela(2003-2008). I further move to Siemens Saudi as Protection Engineer & completed Projects with Clients that include Saudi Aramco, Petrofac , Marafiq, Saudi Electricity (Eastern, Central & Western Region), SIPCHEM (Saudi International Petrochemical Company), SABIC,YANSAB Yanbu National Petrochemical Company. Having plate form of Siemens Saudi. I have core competancy in Protection Relays, Protection Scheme, GIS/AIS equipment testing, Control Schemes, automation system etc.I have Total 10 years of experience in Saudi Arab at 380/132/11kV voltage levels. And completed several trainings related to protection relays & automations system in Saudi Arab & Germany. Previleged to work in Pakistan for 6 plus years with NTDC ( National Transmission & Dispatched Services ), WAPDA ( Water & Power Developement Authority) & Pioneer Member of ETCS ( Erection Testing & Commissioning Services) , Completed Projects in Pakistan with clients K.E ( K-Electric), GETZ Pharma, Amreli Steel, DHA( Defence Housing Authority).