
Explore engineer-to-order cost flows in SAP S/4 HANA: compare production order versus non-production order scenarios, including expense booking, variance calculation, settlement, result analysis, and profitability reporting.
Define the enterprise structure in the SAP system, including company code, plant, division, sales organization, distribution channel, purchasing organization, shipping point, factory calendar, and the mapping assignments.
Configure SAP financial accounting, including general ledger and chart of accounts setup. Set field status variants, fiscal year and posting period variants, document types, and tax procedures for the Netherlands.
Configure a single business partner number range to link customer and vendor accounts in SAP S/4 HANA. Define internal and external ranges and assign them to customer and vendor groups.
Explains basic material management configuration for COPC in SAP S/4 HANA, covering consumption based planning, purchasing, inventory management, valuation and account assignment, invoice verification, and logistics execution.
Learn the basic COPC configuration in SAP S/4 HANA, covering MRP controller, production supervisor, work center, availability checks, scheduling, confirmation, and activity type formulas linked to process orders.
Configure a controlling area in SAP S/4HANA, linking company codes, defining ledgers and currencies, setting chart of accounts, physical variants, and version ranges for product costing and internal reporting.
Explore fi-mm and fi-sd integration with obyc and vkoa mapping in SAP S/4 HANA, detailing GL account setup for procurement to pay, production, and sales cycles.
Design and implement profit center and cost center standard hierarchies within the controlling area, create master data and hierarchical groups across company code, plant, and material levels for internal reporting.
Learn to design a cost component structure in SAP, breaking product cost into material, labor, and overheads with up to 40 components and price control options.
Explore the cost component structure for product costing: define primary and secondary cost elements, link expenses to routing via activity types, and model indirect and r&d costs with costing sheets.
Understand costing variant concepts for sap s/4 hana co: standard, preliminary, and simultaneous costs, with variance settlement, valuation variants, quantity structure, and updates to the material master.
Learn how to configure variance and settlement in SAP S/4HANA, including allocation structures and settlement profiles, to support profitability analysis and product costing prerequisites.
Learn how to configure SAP S/4HANA material ledger across company code, group and index-based currencies, activate actual costing, and set up production startup for ETO scenarios.
Learn how to configure SAP S/4HANA CO product costing for an ETO scenario, from operating structure and operator structure to WBS elements, networks, and settlement with result analysis.
Activate project management in the controlling area, define value categories for expenses and revenues, and map cost elements to groups and valuation categories, then verify consistency.
Configure ETO-related production in SAP S/4HANA by defining a requirement class, planning strategy, and settlement profile, and map project, network, and material for result analysis.
Configure the SAP S/4HANA result analysis key to calculate revenue and cost, determine profit, and assign cost elements, valuation methods, and settlement steps for eto scenarios.
Configure result analysis keys and settlement profiles within SAP Project Systems to map WIP, unrealized costs, and evaluated revenue to the correct GL accounts for make-to-order and ETO scenarios.
Explore configuring allocation structures and settlement profiles for SAP S/4 HANA CO product costing in an ETO setup, linking WBS elements, networks, and result analysis to profitability.
Explore two CO product costing scenarios for the ETO scenario: with production order and without, detailing expense booking, variance settlement, result analysis, and profitability reporting in the A-3 report.
Set up material master, BOM, and routing for a SAP S/4HANA CO product costing flow in an ETO scenario, covering basic data, MRP, procurement, and stock upload of input materials.
Explore creating standard project, standard WBS, and standard network in SAP S/4HANA, assign project profiles and result analysis keys, and link materials for automatic settlement and costing.
Explore production order creation by WBS, conduct goods issue and activity confirmation, apply backflush, and settle material and activity costs to the WBS with variance analysis.
Perform wbs result analysis calculation and settlement in the eto co product costing flow, linking wbs elements to profitability segments and posting revenue, cost, and profit.
Create a material master and set up work centers in networks for a no production process scenario, covering MRP planning, activity types, and costing integration.
Learn to create standard project profiles, WBS elements, and networks, link them to materials, and generate a sales order in SAP S/4HANA CO product costing for ETO scenarios.
Book actual material costs directly to a WBS element or network without a production order, using activity confirmations and settlement to update profitability segments.
Learn how to execute SAP S/4 HANA co product costing for ETO, including sales order billing without delivery, WBS element settlements to profitability segments, and profit reconciliation via internal settlement.
Engineer-to-Order (ETO) product costing flow in SAP S/4 HANA, which is often associated with the Project Systems (PS) module due to its project-oriented nature.
ETO is a strategy where products are manufactured based on each specific customer's requirements. It involves unique designs and specifications for every order, requiring close integration of sales orders, design, manufacturing, and costing.
A) ETO Production Process with Production Order
Project Creation: Upon receiving a sales order, a Work Breakdown Structure (WBS) element is auto-generated. This is achieved by having a standard project template with predefined WBS elements and networks.
Design Phase: This includes designing the BOM (Bill of Material) and Routing, which lay out the materials required and the production steps, respectively.
Production Order Creation: A production order is generated with reference to the WBS. This production order gets its BOM and routing from the ETO product.
Goods Issue: Materials required for production are consumed. This process reduces inventory and books the costs to the production order.
Activity Confirmation: The labor hours and machine hours used in the production process are confirmed, recording the actual time taken for each operation.
Goods Receipt: Once the production is completed, the finished goods are received into stock. This results in capitalizing the finished product's cost.
Variance Calculation: Differences between planned and actual costs are determined.
Settlement: The costs accumulated on the production order are settled to the WBS element.
Billing & Revenue Recognition: Once the product is delivered to the customer, billing is done. The revenue is captured at the WBS level.
Results Analysis (RA) Key Calculation: Determines profit/loss by comparing the revenue against the costs.
COPA Settlement: The profitability of the order is analyzed by settling the data to Controlling Profitability Analysis (COPA).
B) ETO Production Process without Production Order
Project Creation: Similar to the above process, a WBS element is auto-generated upon receiving a sales order using a standard project template.
Work Centers & Activities: Define work centers for different activities like machining, labor, etc.
Goods Issue: Materials are issued directly to the WBS element, thereby reducing inventory and booking costs to the WBS.
Activity Confirmation: Labor and machine hours are confirmed directly against the network activity.
Results Analysis (RA) Key Calculation: Determines profit/loss by comparing the revenue (from billing) against the costs accumulated at the WBS element level.
COPA Settlement: The profitability is analyzed by settling to COPA.
Conclusion: In ETO scenarios, the SAP Project Systems (PS) module's integration with Controlling (CO) and Logistics (LO) is crucial. Whether with a production order or without, it's essential to maintain transparency of costs and revenues associated with each project. SAP's ability to link these elements ensures accurate cost tracking and profitability analysis for ETO scenarios.