
Learn pre-contract management for quantities, including tender documents, a bill of quantities, SESAME four, downloadable checklists, tracking progress, the digits zero and nine, and proper soft and hard copy documentation.
Explore the key tender documents in bidding, including invitation letters, form of tender, price and contract details, securities, pre-qualification, drawings, specifications, bill of quantities, and schedule of rates.
master the basics of a bill of quantities (boq), including item descriptions, quantities, units, rates, totals, and currency variations across contracts and trades.
Prepare a bill of quantities using cesmm4 by classifying pipe works and manholes, detailing measurements, units, references, and ensuring compliance with drawings and specifications.
Clarify project scope and required documents before boq preparation, and use a query sheet to address missing data, material types, and the standard method of measurement for pre-contract quantities.
Explore a QTO template for pre-contract works and civil quantity takeovers, designed for MEP items, usable by consultants or contractors for tender validation and auditable quantity checks.
Explore how digits zero and nine govern item coding in sesame four, including how to record divisions, diameters, and trench depths when data is missing.
Use a pre-contract tracker sheet template to monitor quantity surveyors' takeoff, auditing, and validating work, from plan to actual. Manage holidays, resources, and deadlines and compare planned versus actual progress.
Organize quantity surveyor documents by creating soft-copy folders for pre-contract and post-contract work, and link them in an Excel sheet with hyperlinks to cost reports and correspondences for quick access.
Learn how to efficiently number a bill of quantities using an Excel formula that auto-numbers items across pages, with three cells for description, previous cell, and unit of measurement.
Welcome to this course on Quantity Surveyor's Guide for Pre-Contracts Management.
Quantity Surveyor's play an important role during the Pre Contracts Stage of any project. During this stage, if proper management of works are done, then once the execution stage of the project begins, the chances of the project getting successfully completed is very high.
By the end of this course, you will learn the following:
Different Tender Documents involved in a Construction Project.
Basics of Bill of Quantity and Technique to prepare the same.
Sample BOQ Preparation using CESMM4 Standard Method of Measurement.
Quantity Measurement sheet to capture all you Take Off's from Construction Drawings.
Template to monitor the progress of your team's work.
The importance of digits 0 and 9 while preparing a BOQ.
Hyperlinking all soft copies of work related files for an effective documentation.
Checklist to follow while preparing a Bill of Quantity with Query Sheet template.
Excel formulae for numbering a Bill of Quantity.
You can download and use the templates available in this course in your professional life and see the changes happening in your career.
CESMM4 PDF is also available for download for future reference.
All Construction Professionals can benefit from this course. Students & Fresher’s looking to start their career in the construction sector can easily learn the basics and understand new concepts involved in the Pre Contracts stage of a project.
So what are you waiting for. Go ahead and enjoy this course!!!! Happy Learning!!!