
In this video tutorial, you will Learn what is infrastructure and its components with the help of real-world examples
Discover how quantity surveyors quantify infrastructure quantities using drawings, the take-off procedure, and specifications, measuring pipe works and site activities from trenching to testing.
Describe the work inspection request (WIR) process, detailing contractor, consultant, and client roles, inspection against drawings and specifications, and how approvals drive payment.
Understand the delivery note's purpose and essential fields, such as supplier, project, date, and unique numbers, and see how inspectors verify delivery and integrate it with payment application.
Learn to read storm drainage drawings by interpreting legends, symbols, and color codes for manholes and pipes (RCP and GW), and understand plan and section details for quantity estimation.
Explore the underground manhole drawing details from top plan to section views, including diameter, wall thickness, PCC, and concrete construction, to estimate quantities for infrastructure works.
Explore how technical specifications complement drawings by detailing soil preparation, underground piping, manholes, concrete, and the strong drainage system, including execution, product handling, and testing.
Explore the civil engineering standard method of measurement (CSM) and how global length standards, coding, and item classification guide quantity preparation and project pricing.
Learn to read BOQ items with CESMM4 by decoding pipe works classifications, nominal diameters, depths, and reference codes, including exclusions and additional descriptions for BBC pipes.
Learn pipe measurement rules for infrastructure works, including centerline length, fittings, and profile guidance; measure inside manhole surfaces and account for excavation, backfill, reinforcement, and finishes.
Interpret the progress monitoring sheet and quantity sheet using drawing references, column meanings, and key formulas. Understand upstream and downstream, manhole, pipe details, and deductions to determine length.
Learn to use a progress monitoring sheet to track excavation, bedding, pipe laying, backfilling, testing, and commissioning with time and cost weightages and work inspection references.
Quantify pipe work for infrastructure projects using AutoCAD and Excel by entering data from drawings, identifying manhole references, calculating center-to-center pipe lengths, and updating progress with hatch marks.
Explore how to prepare and reference a work inspection request form, assign unique reference numbers, and report site inspections for excavation, piping, and related works.
Learn to perform take-off quantities for manholes by interpreting diameters of 1.2 m and 1.5 m, using reference lines to map wall thickness, and calculating excavation and concrete quantities.
Master pump station 3d drawing from concept to final cut, highlighting practical steps for understanding within quantity surveying for infrastructure works using cad and Excel.
Identify and locate pump station items from sectional drawings of the two rectangular live structures. Quantify components like PCC, retaining walls, foundations, slabs, manholes, waterproofing and roadworks for the BOQ.
Divide the pump station into main structure and shell, draw sections, set offsets, and compute areas and volumes to determine total excavation across deep and shallow portions.
Learn to quantify retaining walls for a pump station by reading plan drawings, defining long and short walls, calculating length, thickness, height, and total volume for deep and shallow structures.
Quantify the solid concrete slab for a pump station by isolating the slab from walls and defining its area. Compute gross and net volumes, deduct openings such as manhole covers.
Explore quantification of stainless steel ladder and manhole cover for a pump station, including 17 meter depth, site sizes, supplier quotations, unit rates, and installation costs.
Calculate vertical waterproofing for a pump station by assessing the front, left, right, and back wall areas. Exclude earth-connected zones and manhole openings, then sum to determine waterproofing area.
Master practical Infrastructure Quantity Surveying and Estimation through a project-based approach using AutoCAD and Excel.
This course focuses particularly on storm drainage systems and infrastructure works, taking you from understanding drawings and project documentation through quantity takeoff, measurement, BOQ interpretation, monitoring and project control.
Rather than learning quantity surveying only through theory, you will work through practical infrastructure examples and see how quantities are measured, recorded, monitored and controlled on construction projects.
What You Will Learn
By completing this course, you will learn how to:
Read and understand infrastructure and storm drainage drawings
Identify the major components of storm drainage systems
Perform quantity takeoff for infrastructure works
Measure pipework from construction drawings
Measure manholes and associated civil works
Use AutoCAD for practical infrastructure quantity takeoff
Use Excel to calculate, organise and monitor quantities
Understand BOQ items for infrastructure projects
Apply CESMM4 measurement principles to civil engineering works
Understand Work Inspection Requests and delivery documentation
Prepare and maintain project quantity monitoring sheets
Compare measured, approved and executed quantities
Support project monitoring and control using quantity information
Practical Storm Drainage Quantity Surveying
A major part of this course uses a storm drainage system as a practical infrastructure case study.
You will learn how a Quantity Surveyor approaches the project from drawings and documentation through to actual measurement.
The course covers:
Storm drainage systems and their components
Infrastructure drawings
Pipework measurement
Manhole measurement
BOQ interpretation
CESMM4
AutoCAD quantity takeoff
Excel quantity calculations
Inspection and delivery documentation
Quantity monitoring and control
AutoCAD & Excel for Infrastructure QS
You will see how AutoCAD can be used to extract and verify quantities directly from infrastructure drawings.
The measured quantities are then transferred into Excel, where they can be calculated, organised, monitored and compared with project information.
This creates a practical workflow:
Drawing → Measurement → Quantity Takeoff → BOQ → Monitoring & Control
Who Is This Course For?
This course is suitable for:
Quantity Surveyors
Civil Engineers
Infrastructure Quantity Surveyors
Construction Estimators
Site Engineers
Cost Engineers
QS and Civil Engineering students
Graduates entering the construction industry
Construction professionals working on infrastructure and utility projects
Why Take This Course?
Infrastructure quantity surveying requires an understanding of drawings, measurement rules, BOQs, project documentation and quantity control.
This course brings these areas together using practical infrastructure examples rather than teaching them as isolated subjects.
If you want to develop practical skills in Infrastructure Quantity Surveying, Storm Drainage Takeoff, CESMM4, BOQ, AutoCAD, Excel and Project Quantity Control, this course provides a structured project-based learning path.