Primavera P6 Ver 18& 19.12 Overview Course and Tutorial
4.2 (160 ratings)
Course Ratings are calculated from individual students’ ratings and a variety of other signals, like age of rating and reliability, to ensure that they reflect course quality fairly and accurately.
4,116 students enrolled

Primavera P6 Ver 18& 19.12 Overview Course and Tutorial

Primavera P6 Ver 18 & 19.12 Overview Course and Tutorial
4.2 (160 ratings)
Course Ratings are calculated from individual students’ ratings and a variety of other signals, like age of rating and reliability, to ensure that they reflect course quality fairly and accurately.
4,116 students enrolled
Current price: $139.99 Original price: $199.99 Discount: 30% off
5 hours left at this price!
30-Day Money-Back Guarantee
This course includes
  • 2 hours on-demand video
  • 4 downloadable resources
  • Full lifetime access
  • Access on mobile and TV
  • Certificate of Completion
Training 5 or more people?

Get your team access to 4,000+ top Udemy courses anytime, anywhere.

Try Udemy for Business
What you'll learn
  • Learn Primavera P6 latest Ver.18 & 19.12 Overview Course and Tutorial-Practical Training in a live software with a Technical Support
  • All levels
  • Students ,Engineers ,Schedulers and Planners
Requirements
  • NO
Description

Learn Primavera P6 Ver 18.8 Overview Course and Tutorial


1. Lecture 1 link:


lecture 1 explain P6 History, P6 Features, P6 Tools, P6 Interface, Critical Path, and CPM technique and terms


2. Lecture 2 Link:

How to download and Install Primavera P6 Ver,18


How to download and install Primavera P6 Ver 18 and Database Configuration on your laptop and be an expert in Primavera

• In this Lecture:

• Installation Guideline step by step with a screenshot

• Database Configuration

3. Lecture 3

Create Project and WBS Details


4. Lecture 4 in Oracle Primavera Ver 18.8 –Activities:


Adding activities and Creating Links


5. Lecture 5 in Oracle Primavera Ver 18.8 –Resources:

Definition of resources, types and details of the resources addition - Measurement units - Prices - Resources codes - How to classify resources to its workers, tools and equipment on the Primavera software last version Ver18.8

How to create Cost accounts for activities and also resources –Adding units to resources –assigning resources and unites and calculate Costs from Units

6. Lecture 6 in Oracle Primavera Ver 18.8 –Create Baselines


Create Baseline the Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.


7. Lecture 7 in Oracle Primavera Ver 18.8 Progress Update

Update the schedule regularly and compare it to the baseline to ensure that resources are being used effectively, project costs are being monitored against the original budget, that there is a knowledge of actual duration and costs in order to initiate contingency plans if  necessary.

Ask the following questions when updating:

· What information needs to be collected to update the project and what method(s) will be used to collect information?

· Who will gather the necessary information used for the project update?

· How often should the project be updated?

· Are resources local or offsite?

· Who will need to see the results of the update and when are these results needed?

· What types of information will be generated after each update in order to communicate progress before the next update period?


Who this course is for:
  • Beginner and professional Engineer
Course content
Expand all 18 lectures 02:06:40
+ P6 Overview and History
2 lectures 12:56

Updated Oracle Primavera P6 Tutorial Course overview

Lec 1 : P6 Overview and History

Lec 2: How to download P6 latest edition free and Configuration

Lec3 : Create Project and WBS Details

Lec4 : Adding Activities

Lec 5: Adding Resources:

Lec 6: Create Baselines

Lec.7: Progress Update

Lec. 8: Live Installation in Primavera

Lec 9: Earned Value Management Overview-KPI’s

Lec 10 : Activities Renumbering

Lec 11: How to schedule Three Projects Together

Lec12 : Writing in any Language in P6

Lec 13: Level of effort Activities

Lec 14: Activity steps

Lec15: Project Calendars -Global Calendars -Resource Calendar

Lec.16 : 3 Week-3 Month Look ahead schedule

Lec. 17: Critical Path

Preview 03:22

lecture 1 explain P6 History, P6 Features, P6 Tools, P6 Interface, Critical Path, and CPM technique and terms

Preview 09:34
+ Lecture 2 How to download and Configuration
1 lecture 04:53

P6 How Download and install Primavera Ver 18 and Database Configuration to work yourself on your laptop and be an expert in Primavera and get a Good Jobs

• In this Lecture:

• Installation Guideline step by step with a screen shot

• Database Configuration

Lecture 2 Link: How to download and Install Primavera P6 Ver18
04:53
+ Lecture 3 Create Project and WBS Details
1 lecture 06:39

Create Project and WBS Details

Lecture 3 Create Project and WBS Details
06:39
+ 4. Lecture 4 in Oracle Primavera Ver 18.8 –Activities
1 lecture 05:27

Adding activities and Creating Links

Lecture 4 in Oracle Primavera Ver 18.8 –Activities
05:27
+ Lecture 5 in Oracle Primavera Ver 18.8 –Resources:
1 lecture 07:30

Definition of resources and types and details of the addition of resources - Measurement units - Prices - Resources codes - How to classify resources to its workers, tools and equipment on the Primavera software last version Ver18.8Orcale

How to create Cost accounts for activities and also resources –Adding units to resources –assigning resources and unites and calculate Costs from Units

5. Lecture 5 in Oracle Primavera Ver 18.8 –Resources:
07:30
+ Lecture 6 Oracle Primavera Ver 18.8 –Create Baselines
1 lecture 04:18

Create Baseline the Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.

Lecture 6 Oracle Primavera Ver 18.8 –Create Baselines
04:18
+ 7. Lecture 7 Oracle Primavera Ver 18.8 – Progress Update
1 lecture 08:30

Update the schedule regularly and compare it to the baseline to ensure that resources are

being used effectively, project costs are being monitored against the original budget, that

there is a knowledge of actual durations and costs in order to initiate contingency plans if

necessary.

Ask the following questions when updating:

· What information needs to be collected to update the project and what method(s) will

be used to collect information?

· Who will gather the necessary information used for the project update?

· How often should the project be updated?

· Are resources local or offsite?

· Who will need to see the results of the update and when are these results needed?

· What types of information will be generated after each update in order to

communicate progress before the next update period?

7. Lecture 7 Oracle Primavera Ver 18.8 – Progress Update
08:30
+ Live Installation in Primavera P6 Ver.19.12 on the software for who have Problem
1 lecture 06:23

Live Installation in Primavera P6 Ver.19.12  Cloud Version on the software

Live Installation in Primavera P6 Ver.18 on the software for who have Problem
06:23
+ Lecture 9-Earned Value Management Overview-KPI’s
1 lecture 08:19

Lecture 9-Earned Value Management Overview-KPI’s:

ØEarned value management (EVM) is a project management technique

Measuring performance and progress Vs. (performance measurement baseline : Versus scope, schedule and cost )

Lecture 9-Earned Value Management Overview-KPI’s
08:19
+ Lecture 10: Activities Renumbering
1 lecture 04:12

Ask Primavera Q&A- 1: Activities Renumbering

Renumber activity IDs in the Activity Table

•Select the activity you want to renumber. To select multiple activities, use Ctrl+click or Shift+click.

•Choose Edit, Renumber Activity IDs.

Proceed as follows from the Renumber Activity IDs dialog box:


Preview 04:12