
Explore Primavera P6 from initiation to closing, defining WBS, activities, resources, baselines, and monitoring progress with actuals and earned value analysis.
Define and structure a WBS in Primavera P6 across levels. Organize tasks like earthwork, concrete work, waterproofing, backfilling, and manage budgets, spending plans, and benefits within AWS.
Explore the Primavera P6 interface, including the menu, directory, and command bars, and learn to manage layouts, views, and earned value data with customization, filtering, grouping, and global change.
Learn how to define and break down project activities from contract, book, specs and drawings; create WBS, assign calendars, estimate durations, and set constraints and relationships in Primavera P6.
Explore how to compute complete percentage in Primavera P6 using five methods—duration, cost, man-hours, amount, and rules of credit—applied to baselines and WBS-linked activity progress.
Explore the Gantt chart area in Primavera P6, where bars and time scale visualize activities from the detail area, with baselines and filters.
Explore how Primavera P6 manages roles and resources, from creating resource dictionaries and enterprise rules to assigning labor, material, and equipment to activities, shaping baselines and schedules.
learn how to assign resources in primavera p6 using mapping sheets and activity coding, automate resource creation, and ensure correct productivity, with examples for dredging, excavators, and trucks.
Discover how to estimate duration and budget units by assigning resources and productivity in Primavera P6, using a resource bank and bulk changes for dredging, excavation, and concrete tasks.
Explore Primavera P6 resources management, including labor, non-labor, and materials, using spreadsheets, histograms, and resource usage profiles to align budgets, calendars, and baseline.
Explains managing Primavera P6 resources using top-down estimation and resource leveling tools, including estimated weight distribution, and discusses leveling vs smoothing, plus crushing and fast-tracking to shrink schedules.
Master resource shift in Primavera P6, including shift calendars and resource calendars. Learn how to align labor and cost with activity and resource calendars, usage profiles, and recalculation.
Analyze cash flow using Primavera P6 by building the project baseline, linking activities, assigning resources, and generating cash in, cash out, and S-curve reports.
Master Primavera P6 schedule tools to create baselines, update progress, and compare against DCMA 14 rules, including data dates, open-ended activities, and lead/lag and constraints.
Explore baseline cash flow calculations and submittals attachments in Primavera P6, covering both basic and advanced level techniques.
Finalize baselines in Primavera P6 through a foundational workshop, covering baseline concepts and practical steps for project scheduling at basic and advanced levels.
Create the project baseline by aligning activities, relationships, durations, and resources, then compare it with primary and project baselines, updating with variation orders as needed.
Explore how Primavera P6 integrates with Excel and notepad through export and import workflows, copy-paste techniques, and template creation to simplify data management for activities, resources, and reports.
Learn to collect data from contracts, define a WBS, build an activity list, and budget with Primavera P6, using four data entry methods: manual, Excel, Notepad, and Primavera.
Update the Primavera P6 schedule by creating a level one baseline, then level two site updates monthly or biweekly, comparing to the baseline and managing variances with the consultant.
Collect data from daily reports, DBR, and tracking sheets, update the BMS and Primavera, compute variances and EVM metrics such as ES, and support reporting, analysis, and action planning.
Examine out of sequence activities in Primavera P6 to understand their impact on project schedules within the complete Primavera P6 diploma.
Update the project schedule in Primavera P6 from baseline, track variances, and apply corrective actions while managing expenses, documents and risks via invoices and request for inspection.
Understand Primavera P6 reporting with three tools: reports, visualizer, and schedule comparison, covering batch and single reports, exporting to Excel, and visualizing activity, resource, and cost data.
Learn how the earned value method (evm) integrates schedule, cost, and earned value to evaluate project performance, with cash-in, cash-out, resource loading, baselines, and KPI-driven forecasting in Primavera.
Explore how to apply the earned value method (EVM) to project performance using key performance indicators (KPIs) within Primavera P6, analyzing cost, schedule, and scope metrics.
Explore earned value management (EVM) in a Primavera P6 project, comparing feasibility study costs, actual costs, planned value, budget, and weekly updates to reveal SV, CV, CPI, and SPI.
Explain how to define and compute percent complete in Primavera P6, covering duration, physical, unit, and cost methods, with baseline and at completion comparisons.
Learn how to measure percent complete for projects and work breakdown structures in Primavera P6, tracking progress across project activities and WBS elements.
Learn to configure lookahead filters in Primavera P6 to forecast two-week activities. Filter by early start within data date plus 14 days and in-progress status for upcoming work.
Explore the earned duration method (edm), a modern, duration-based approach that forecasts project dates using actual duration and the physical percentage, decoupled from earned value and cost measures.
Explore the types of reports in Primavera P6 to understand the reporting options within the complete Primavera P6 diploma.
learn how revised and recovery plans manage baseline changes, variation orders, and updated S-curve in Primavera and Excel, adjusting dates and quantities to reflect actual site progress.
Use Primavera to allocate cash in and create two schedules for consultant and internal management, then apply revised and recovery plans by rebaselining in-progress work and updating budgets.
Develop a Primavera P6 schedule from data collection and activity relationships, and analyze cash flow and S-curve, balancing cash in and cash out for consultant and management reviews.
Integrate Primavera P6 scheduling with cost management and Power BI in the pricing stage, building a high-level WBS and resource loading outputs for cost estimation.
Develop cost estimates and cash-out flow plans by mapping labor, equipment, and materials in Primavera, creating the resource breakdown structure and a sheet with expense distributions.
Break down cash out into per-resource payments aligned with contracts, distribute costs by subcontractor and time interval using Primavera reports, and reconcile with Excel for accurate vendor expenses.
Learn to distribute cash in across project activities using weighted cost percentages in Primavera, create a cash in resource, and prepare a weekly client invoice and day-by-day payment plan.
Explore how to use AI for planning, costing, and reporting in Primavera P6 projects, including building mapping sheets, POQ items, cost estimation, and AI-driven workflows.
Explore how to prepare a project baseline in Primavera P6, including reviewing contracts and method statements, defining WBS and OBS, linking activities, estimating durations, and measuring progress with earned value.
Learn the planning engineer role, baseline creation, schedule health checks, variances, and corrective actions using Primavera, MS Project, Excel, and Power BI for reports.
Track site progress with daily reports, productivity, and warehouse inventory; input actuals in Primavera P6 to update the schedule, baseline, and the critical path while reviewing equipment and subcontractor progress.
Explore how to set up cash in and cash out in Primavera P6, including partial price calculations, estimated weights, and cost distribution across the project. Demonstrate creating a cash in resource, assigning it to activities, and generating two curves for cash in and cash out to support look-ahead reporting.
Learn how to manage Primavera P6 schedules, including baselines, revised schedules, and EOTs. Get practical guidance on progress updates, two-week lookahead, and critical-path forecasting.
Define and break down the project using WBS and detailed activities, estimate durations and resources, then build a Primavera schedule with logical relationships, baselines, and critical path focus.
Learn how to manage cash in and cash out in project controls and how Primavera handles costs, not cash flow, then build a cash-flow distribution using a dummy cash-in resource.
Our Primavera P6 Diploma Outline:
Comprehensive Introduction to Primavera P6: From fundamentals to advanced applications.
Planning Engineer Responsibilities: Key roles and duties throughout the project lifecycle.
Full Workshops & Mini-Projects for each Tool.
In-Depth Explanation of All P6 Menus and Tools.
Creating the Enterprise Project Structure (EPS): Managing projects and portfolios.
Reading and Analyzing Project Documents.
The Relationship Between Portfolios, Programs, and Projects.
Developing the Work Breakdown Structure (WBS) and Defining Activities.
Activity Types and Their Properties.
Understanding Activity Steps.
Advanced Gantt Chart Options.
Bars Customization.
Time Scale Configuration and Customization.
Formatting Columns and Rows.
Understanding Progress Percentage.
Methods for Calculating Progress Percentage.
Inter-departmental Coordination for Progress Calculation.
Creating the Activities List.
Defining Logical Relationships Between Activities.
Defining Roles and Resources.
Estimating Resource Quantities for Each Activity.
Duration Estimation Techniques.
Types of Duration.
Scheduling Properties and Settings.
Applying Actual and Progress Update Tools.
Creating and Managing the Project Baseline.
Work Progress Data Collection.
Performance Data Analysis.
Updating the Project Schedule.
Document Control Procedures.
Identifying and Managing Issues & Risks.
Managing Project Expenses.
Reporting and the Visualizer Tool.
Integration Between P6, Excel, and Notepad.
Using Global Change and User-Defined Fields (UDF).
Group, Sort, and Filter Tools.
Cost Accounts Management.
Cash-in & Cash-out Calculations.
S-Curve Generation and Analysis.
Manpower & Resource Histograms.
Creating Two-Week Lookahead Reports.
Implementing a Coding System.
Top-Down Estimation Methods.
Storing Period Performance Data.
Managing Financial Periods.
Writing Narrative Reports.
Preparing Final Project Reports.
Printing Hints and Best Practices.
Advanced P6 Tips & Tricks.
Developing Recovery & Revised Plans.
Corrective & Preventive Actions.
Earned Value Management (EVM).
Note:All Videos done eithout using any AI .