
Learn how the critical path method controls project duration by identifying critical activities and calculating early start, early finish, late start, late finish, and float in Primavera P6.
Learn how to download and install Primavera P6 Professional for project management, from signing into Oracle Cloud and selecting a version to extracting files and completing the setup.
Explore the Primavera P6 user interface with left-hand table and right-hand gain chart. Use time scale, toolbars, menus, and tabs to manage predecessors, successors, resources, and the project detail window.
Learn how to create an organizational breakdown structure (OBS) in Primavera P6, defining who has access to projects and arranging the hierarchy from a chief director to directors.
Learn how to create and organize an enterprise project structure (EPS) in Primavera P6, connect OBS to EPS, manage department hierarchies, and avoid unintended project deletions.
Before creating a project in Primavera P6, set the time unit, unit format, duration format, and date format. Adjust decimals and show minutes, then uncheck the wizards to avoid interruptions.
Create and customize calendars in Primavera P6 by copying a default calendar, adjusting the work week, holidays, and exceptions, and assign them via global, project, or resource polls.
Create a Primavera P6 project by setting the calendar and start date, build a WBS with brick and plaster work, and use finish-to-start relationships to schedule 54 days.
Learn how to identify milestones as zero-duration events with start and finish milestones, and master finish-to-start, start-to-finish, start-to-start, and finish-to-finish relationships, including lead and lag adjustments in Primavera P6.
Schedule your Primavera P6 project by validating calendars, the project data date, and WBS, then use F9 to run the schedule; distinguish total float from free float and their effects.
Create a Primavera P6 calendar with 2019 public holidays and a September 24, 2019 exception, set a 48-hour week, and define 7:00 a.m.–4:00 p.m. workdays with a 1:00–2:00 p.m. lunch.
Create a Primavera P6 project from scratch by building artwork work breakdown structures for substructure, superstructure, and finishing work, defining activities such as excavation, backfilling, columns, beams, and slabs.
Set unit of measurement and abbreviations for material resources. Create a local currency with id, name, symbol, and true exchange rate against the dollar, then assign it to the project.
Learn how resource loading works in Primavera, covering maximum unit per time, budgeted unit per time, price per unit, budgeted cost, and creating and assigning labor, non-labor, and material resources.
Learn to create and assign material and labor resources in Primavera P6 Professional, including blocks, cement, sand, and crew roles, with dummy resources, calendars, budgets, and cost calculations per activity.
Learn to create and assign resources in Primavera P6 Professional, including cement, sand, aggregates, and labor roles, set budgets, units, rates, and local currency for plaster and PCC activities.
Explore resource usage profile and resource usage spreadsheet, along with activity usage profile and activity usage spreadsheet, to check relocation and overall location against daily maximum units.
Master resource leveling in Primavera P6 by removing overallocation through manual methods: delaying, splitting, stretching, and crunching, while understanding automatic leveling and its impact on project duration.
learn how to create and assign baselines in Primavera P6 to copy the project plan, compare it with actual progress, and manage primary, secondary, and tertiary baselines.
Update a Primavera P6 project by entering actual start, actual finish, and percent complete, then reschedule and save a new baseline, comparing plan with actual.
Create lookahead schedules in Primavera P6 by using filters to display upcoming activities within a one to three month window.
Learn to create and assign baselines in Primavera P6, update activities with actual starts and percent complete, set the data date, and compare plan versus actual.
Generate and customize Primavera P6 reports, including on-screen reports and actual and plan comparisons, by selecting columns, baselines, and statuses, then export to pdf, html, or batch-run multiple reports.
Master import and export in Primavera P6, exporting to SCR, Excel, XML, and MPX formats, and importing from Excel and MPX files.
Learn to create a three-month material procurement schedule in Primavera P6, planning concrete, steel, and other materials. The lecture covers creating resources, assigning them to activities, and generating reports.
Create material procurement in Primavera P6 by assigning cement, sand, and aggregates to activities, and set daily projected units and budgeted units.
Use global change to rename activities and reassign resources across a project, applying subject-area filters to update activity names or resource names and related expenses, then commit the changes.
Group activities under a single WBS with activity codes in Primavera P6, creating concrete and steel codes, assigning them, filtering, and grouping by activity types.
Explore duration types in Primavera P6 and see how fixed unit per time, fixed duration, and fixed units shape budgeted unit, unit per time, and budgeted cost.
Learn to compress a project schedule with fast tracking and crashing on critical activities, applying start-to-start with lag and resource-driven duration reductions.
Primavera P6 Professional – Complete Project Planning & Control (With Live Project)
Unlock the full power of Primavera P6 and become a confident planner who can manage real-world construction projects from start to finish.
This course takes you from project scheduling fundamentals to advanced control and reporting techniques — all demonstrated through a complete live residential project (10 Marla House).
Designed for engineers, planners, and students, this course blends theory + practical implementation, giving you hands-on skills exactly as used in the industry.
What You’ll Learn:
Master the Critical Path Method (CPM) and understand real scheduling logic.
Navigate and customize the Primavera P6 interface like a professional.
Build Enterprise & Organizational Breakdown Structures (E.P.S & O.B.S).
Create WBS, Activities, Calendars, and Milestones tailored to real projects.
Load Resources & Costs, and balance them using professional leveling tools.
Set Baselines, update progress, and monitor time–cost performance.
Generate Look-Ahead Schedules, Financial S-Curves, and Resource Histograms.
Apply Earned Value Management (EVM) for performance tracking.
Manage Procurement, Documents, and Overtime directly inside P6.
Work on a complete live project, from BOQ interpretation to final reporting.
Course Journey – Section Overview
Section 1 – Critical Path Method
Learn the foundation of project planning and how CPM drives every decision in Primavera P6.
Section 2 – User Interface
Understand the P6 environment, navigation, and customization for faster and smarter work.
Section 3 – Enterprise & Organizational Breakdown Structure
Build the enterprise and organization framework that supports multi-project control.
Section 4 – Calendars, WBS & Activities
Create project calendars, structure the WBS, define activities, and connect milestones for a complete schedule.
Section 5 – Creating & Assigning Resources
Learn resource loading, productivity calculation, and the importance of proper assignment.
Section 6 – Resource Leveling
Balance workloads using resource usage profiles and automatic leveling.
Section 7 – Updating & Monitoring
Create baselines, update progress, and prepare look-ahead schedules for management reporting.
Section 8 – Reporting
Generate accurate reports, import/export data, and prepare professional deliverables.
Section 9 – Material Procurement
Track materials, delivery timelines, and integrate procurement into your master schedule.
Section 10 – Advanced Topics
Master key features such as Global Change, Activity Codes, Duration Types, and Fast Tracking & Crashing.
Section 11 – Document Management & Overtime
Organize project documentation and plan overtime schedules effectively.
Section 12 – Roles, S-Curve & Resource Histogram
Assign roles, build financial S-Curves, and visualize manpower through histograms.
Section 13 – Earned Value Management (EVM)
Evaluate cost and schedule performance with real data using professional EVM techniques.
Section 14 – Cost Accounts & Progress Updation Using Steps
Learn cost tracking and staged progress updates for precise monitoring.
Section 15 – Project Kick-Off & BOQ Understanding
Start the live project by interpreting BOQ data and defining project scope.
Section 16 – Building WBS & Activity List in Excel
Develop a full WBS and activity list in Excel — the same way professionals plan before importing to P6.
Section 17 – Project Milestones & Duration Planning
Define project milestones and assign durations based on productivity analysis.
Section 18 – Creating the Project in Primavera P6
Build your Primavera P6 project file, set up WBS, and import all prepared activities.
Section 19 – Developing the Project Schedule
Establish logical relationships and define project milestones inside P6.
Section 20 – Resource & Cost Loading (Real Project Implementation)
Import BOQ costs, calculate budgeted units, assign resources, and resolve over-allocations.
Section 21 – Project Tracking, Baseline & Updating
Create a tracking sheet, assign baselines, and update real-time progress with cost data.
Section 22 – Project Reporting & Analysis
Generate look-ahead schedules, financial S-curves, and resource histograms using both Excel and Primavera.
Who This Course Is For
Civil / Construction / Planning Engineers
Project Managers & Site Coordinators
Students & Fresh Graduates seeking planning jobs
Anyone who wants to master Primavera P6 through a real-world project
Why Choose This Course
100 % Practical and Field-Oriented
Based on a complete live residential project
Includes practice files + PDF questions
Lifetime access & updates
Builds confidence to work in a real planning office environment
By the end of this course, you’ll be able to independently plan, schedule, monitor, and report any project using Primavera P6 — just like a professional planner in industry.
Enroll now and take your Primavera P6 skills from beginner to expert through a complete, step-by-step real project journey!