Udemy
    •  
    •  
    •  
    •  
    •  
    •  
    •  
    •  
Turn what you know into an opportunity and reach millions around the world.
Learn More
Your cart is empty.
Keep shopping
Primavera P6: Optimizing planning with drag and drag cost.
Rating: 3.6 out of 5(12 ratings)
1,182 students

Primavera P6: Optimizing planning with drag and drag cost.

Faster: Advanced Project Scheduling for Increased Profitability and Impact
Last updated 9/2026
English
English [Auto],

What you'll learn

  • You will learn to manage project time. "Time is King"
  • You will learn to optimize the schedule with drag and drag cost.
  • You will learn to computerize the full cost of project activities.
  • You will learn to deal with resource elasticity using DREDD.
  • You will learn how to calculate expected project profit and benefits.
  • You will learn how to create and monitor the CPI, SPI and DIPP.

Course content

11 sections56 lectures1h 10m total length
  • What are the course objectives.0:34

    Discover how to optimize project schedules using drag and drag cost techniques to create business value and benefits for small and large projects.

  • What will you learn1:06

    Primavera P6 shows how to manage project time, optimize schedules with drag and drag cost, assess full costs, and balance resource elasticity against project benefits to maximize profits.

  • Bio Jan van den Berg0:29
  • Owner's or contractor's point of view2:35

    Examine Primavera P6 planning optimization from an owner's or contractor's perspective, highlighting drag and drag cost considerations.

Requirements

  • Advanced knowledge of Primavera P6 and Earned Value Management.

Description

Course Objective: Introduction to Primavera P6

This course equips students with advanced Primavera P6 techniques to optimize construction Project planning and scheduling. Students will learn to enhance Project performance, increase profitability, and maximize business value by leveraging critical path drag and cost analysis.

Critical Path and Drag

A critical path is a sequence of activities directly impacting the Project's overall duration. Drag, an essential concept in Project scheduling, quantifies the delay caused by a critical path activity or the potential time savings from accelerating it. (Stephen Devaux)

Beyond Traditional Project Management

While traditional Project management, as outlined in the PMBOK Guide, emphasizes execution and on-time, on-budget delivery, this course goes deeper into strategic Project management. Key objectives include:

  1. Maximizing Business Value: Identifying and capitalizing on opportunities to increase the overall value derived from projects and investments.

  2. Enhancing Profitability: Implementing strategies to improve Project margins and overall financial performance.

  3. Realizing Broader Benefits: Recognizing and addressing the wider societal and environmental implications of projects, such as reduced traffic congestion, accelerated drug development, and improved public health outcomes.

  4. Beyond planning and drag analysis, you'll learn to track Project performance using earned value metrics — calculating and monitoring the Schedule Performance Index (SPI) and Cost Performance Index (CPI) throughout execution. You'll build spreadsheets to track earned value, interpret Gantt charts alongside EVM histograms, and use the DIPP to report Project status — giving you a complete toolkit for both planning and control.

By mastering these advanced techniques, students will be empowered to drive significant improvements in Project outcomes and contribute to organizational success.

Who this course is for:

  • This mastercourse is for projectmanagers and project planners/schedulers who want to learn how to use drag, drag cost and the DIPP to enhance profits of a project.