
Develop Primavera basics by building an enterprise project structure and obs, creating calendars and wbs, and mastering activity relationships, cost and resource loading to produce project s-curves and histograms.
Learn how to download the basics of Primavera P6 from Oracle Software Delivery Cloud by creating an account, verifying email, signing in, and selecting the project management version.
Install Primavera P6 version 16.2 by walking through file setup, base configuration, and a standalone database, using admin credentials to complete the initial launch.
Learn how to configure essential P6 settings for first-time setup, including setting the industry to engineering and construction, and adjusting time and unit preferences, date and time formats, and currency.
Explore the basic p6 interface, including the top and bottom layouts, the activity and chart views with a time scale, and the details panel with resources, relationships, and status.
Explore the organizational breakdown structure (obs) and how to build and visualize it in Primavera P6, converting enterprise data into a coherent project team chart with roles and responsibilities.
Explore how to structure projects in the enterprise project structure, create and organize P6 folders such as baseline, update, and EOD, and manage programs within a project hierarchy.
Define Primavera P6 calendars via four steps: general days, general hours, specific days, specific hours; configure six working days, eight hours, Ramadan and summer time, and assign to project activities.
Create a new project in Primavera P6, set start and finish dates, apply a calendar and baseline, then build the WBS with milestones like engineering, construction, and handing over.
Learn six activity types in Primavera P6—task dependent, resource dependent, start milestone, finish milestone, WB summary, and level of effort—along with related calendars, durations, and basic linking of activities.
Learn to define activity relationships in Primavera P6, including finish-to-start, start-to-start, finish-to-finish, and start-to-finish, plus lead and lag effects for accurate scheduling.
Explore how externally imposed constraints affect start and finish dates in construction schedules, compare soft and hard constraints, and stress using constraints only when contractually documented.
Develops a practical workflow to build a work breakdown structure and activity list in Primavera P6, link activities, set relationships, and group and sort by start date and float.
Format columns and activity IDs in Primavera P6 by adjusting font and color, configuring numbering, and selecting early start, early finish, duration, and baseline calendars.
Adjust the time scale and bar chart settings in Primavera P6 to display primary dates, ordinal dates, and weekly or daily formats, and configure baselines, legends, and progress lines.
Learn to create and apply filters in Primavera P6 to isolate casting concrete activities, and build two weeks look ahead program using start, finish, and critical activity filters.
Explore creating and organizing activity codes and goods across divisions to plan cost and resource loading, applying filters and groupings for excavation, backfilling, waterproofing, and finishing work.
Explore detailed and overall resource loading in Primavera P6, distinguishing labor, non-labor, and material resources, and learn to link quantity, rate breakdown, and productivity to cost estimation.
Load boq costs into Primavera P6 by allocating a non-labor budget resource and applying floor-based percentages when breakdown is unavailable. Link activities and distribute costs across floors and work packages.
Learn to create an s-curve in primavera p6 by extracting monthly budget and cumulative costs, using either the program’s activity usage profile or an excel workflow.
Learn to create a manpower histogram in Primavera P6 using the resource usage profile and resource usage spreadsheet, filtering by current project labor resources and building per-resource and overall histograms.
Learn to run Primavera P6 program schedule, set baselines, choose save options, and read logs to verify critical path, relationships, and calendars. Understand retaining logic, progress override, and actual dates.
Export and import Primavera P6 projects and layouts, selecting the correct export version (16.2 or later), and apply the baseline layout to preserve configuration.
Learn to print the Primavera P6 schedule by configuring page setup for landscape, fitting the timescale to one page, and adjusting headers, footers, sections, and revision.
Hello and welcome to Primavera P6 Construction Management Planning & Scheduling online course.
This course is all about how to create a construction p6 program of work
The course is structured in a way that will take you from A to Z on how to create a baseline program for any project
This course is very much recommended for you if you meet any of the below criteria:
1 - If you want to learn how to make a baseline project from zero.
2 - If you have p6 software knowledge but you don't know how to start
3 - If you don't know which planning software that you should use or you want to expedite the process and maximize the outcome.
4 - If you want to be able to present your project methodology and get all the charts
5 - If you are struggling with project review and understating the scope of work and which items should present in the program.
6 - If you want to knowhow to add resource in the program.
7 - If you want to see the s-curve and cash flow.
By the end of this course you should be able to:
1 - create a full program for any project
2 - Increase your knowledge as a planning engineer
3 - Learn how to use primavera p6
4 - Present your s-curve data with visuals (p6 ).
5 - Present your manpower histogram data with visuals (p6 )
6 - Understand the relationship between activity's.
7 - create project calendars
8 - understand the activity types
Steps that you will be taking to gradually increase your knowledge during the course:
1 - Watch the course introduction
2 - Install the p6
3 - Watch the course lectures
4 - Start using / applying what you learn in each lecture
5 - Create your project schedule
The course is a mix of theoretical knowledge and practical experience on how to create a schedule program for a project, and it focuses only on step by step how to create a project. It will be followed by a series of courses that will cover the complete construction picture from cost and time points of view as following:
1 - Construction measurements, quantity estimation & BOQ (Released).
2 - Cost estimation (Released).
3 - Primavera P6 Construction Management Planning & Scheduling (This Course).
4 -procurement (Released).
6 - Project execution and cost control (Planned to be release)
Generally, Primavera P6 Construction Management Planning & Scheduling courses online are short and easy to digest, however they add tons of value and knowledge to you.
I'm very exited to have you here guys reading all of this and since you made it to the end of this course description, see you in the first lecture.
If you have any queries related to this course, please don't hesitate to contact me for clarification.
Kind regards,
Ahmed Taha,
PMP, M.E.