
Course Content
Installation Guide
Open a project, add activities, manage columns and views (table and Gantt), and explore activity details and top/bottom views in Primavera P6 19.12 professional.
Learn to create and customize calendars in Primavera P6, including global, resource, and project calendars, set work weeks, holidays, and shift patterns, and apply calendars to activities.
Insert and manage the duration column for activities, set up and link relationships for automatic scheduling, and view the project total length with critical activities highlighted.
Learn how to edit relationships between activities in Primavera P6, including setting predecessors and successors, finishing or restoring connections, and adjusting the sequence to fit project needs.
Learn what float means in Primavera P6 19.12 professional, including free float and total float. See how the critical path sets zero float and how delays affect project timing.
Explore how bars in Primavera P6 19.12 professional indicate activity status with red highlighting for critical work, and learn to customize formatting, preferences, legends, and board labels in project view.
Learn how to apply spotlight to highlight specific activities in a project, customize spotlight text and colors, insert curtain between timeline pillars, and adjust timescale settings.
Learn to set up and customize print options in Primavera P6 19.12 professional, including printing only activity names, charts, or activity tables, by selecting the desired options.
Learn to use user defined fields in Primavera P6, including configuring confidence level, quantities, and unit of measurement, and managing them through view columns.
Assign resources to specific activities, use the view tab to open activity uses and review resource profiles for leveling, and note calendar differences that affect the project.
Discover how Primavera P6 uses task-dependent and resource-dependent activity types, configure step-based progress with start and finish, manage status and physical units, and consider calendars in scheduling.
Master setting up and editing resource curves in Primavera P6 19.12 professional. Assign resources to activities, configure resource codes, and adjust resource units on the resource curve.
Learn to use cash flow to manage costs in Primavera P6, applying activity profiles across quarterly periods, and compare baseline plans with actual expenditures.
Learn to classify and assign direct and indirect costs in Primavera P6 19.12, linking expenses to specific cost accounts and activities with budgeted versus actual cost tracking.
Create and name a project baseline in Primavera P6, save a copy, and track progress by comparing planned activities to the baseline to spot delays or ahead of schedule.
Identify and categorize risks, assess their probability and impact on schedule and cost, assign responsibility, and plan responses to manage risks within the project using project management methodology.
Course Content
· Project Management Module
· Installation Guide
· In depth installation of Primavera P6 from where to download Primavera package as well as installation of it in all sort of Operating Systems
· Bars Explanation
· Enterprise Project Structure (New EPS)
· Adding New Project in EPS
· Toolbars
· Toolbars breakdown
· Activities Addition
· Activities breakdown
· Setting up Columns
· Columns Break down
· Setting up Top & Bottom View
· In depth explaining of top and bottom view
· Calendars Setting & Applying Calendar
· Applying Relationships
· Total length of all activities
· Total length of all the WBS
· Total Length of Project
· Importing and Exporting Project
· Explaining importing and exporting of project in different formats such as P6 Format, Excel Format, MS Project Format
· Relationship Editing & Applying Relationship
· Total Float (Slack)
· Formatting Customization (Date, Currency etc)
· Progress Spot Light
· Writing Comments in Timeline Area
· Phases of Project
· Time Scale
· Print Setup
· Printing Selective Area i.e Gant Chart, Gant Chart with Activities table
· Work Breakdown Structure (WBS), WBS Dictionary, Adding Activities in WBS
· Organization Breakdown Structure (OBS)
· Activity Codes Addition
· Assigning Resources
· Resource Leveling
· Milestones (Finish Milestone, End Milestone)
· Activity Types
· Resource Curves
· Cost Usage (Cash Flow, S-Curve, Cost Account)
· Tracking(Baseline, Update Progress, Progress Calculation)
· Risk and Its Impact on Activities as well as resources