
The PDF file includes instruction Material and the Video file includes discussion so review the pdf file after listening to the video.
من الافضل طباعه اللوح لكي تستوعبها جيدا اثناء الشرح وتمارس مراجعتها معي
وفقكم الله !
Review and verify vertical pressure vessel documents, including nozzle details, material lists, dimensions (inner and outer diameters, thickness), welding details, and inspection and witness point documentation for construction readiness.
من الافضل طباعه جميع اللوح لكي تستوعبها جيدا اثناء الشرح وتمارس مراجعتها معي
وفقكم الله !
من الافضل طباعه جميع اللوح لكي تستوعبها جيدا اثناء الشرح وتمارس مراجعتها معي
وفقكم الله !
تم ارسال كود ازمي مرفق مع المحاضرة الثالثه
lecture three
ازم تطبع ورق مشروع 1512-V407
GA DRAWING, ITP, WELDING MAP, (WPS CPE2, CPE3).
Examine general arrangement drawings, design notes, welding details, nondestructive examination, and testing requirements to understand pressure vessel fabrication, heat treatment, and hydrostatic testing.
Review internal and external diameter tolerances, the relationship among maximum, minimum, and nominal diameters, and alignment, joint, nozzle, and thickness requirements for pressure vessels.
السلام عليكم هذا الكورس مصمم لك خصيصا لكي ينقل لك خبرات هامه وانت في مكانك تجلس وتتشارك معنا
ولذلك ستجد هذا الكورس سهل ومبسط ومدعم بالامثله من المشاريع الكبري لشركات مصرية وعالمية
مما يكسبك معلومات هامه في بيئه عملك والعديد من المعلومات التي ستفيدك في الانترفيو
لن تحتاج ان تسال كثيرا في موقعك وتتعرض الي احراج من بعض الفنيين لكن معنا ان شاء الله ستكون المعلم لهم وقائدهم.
gain our experiences in just three hours !!!
Course benefits:
1 good course material from international companies' projects.
2 easy and effective training so all information is supported with pictures and videos.
3 variety of experiences from different types of pressure vessels in oil & gas and petrochemical plants.
4 actual case studies with answers will enhance your career and gain you experience.
Course daily contents:
Day-1
1 introduction about Pressure Vessels according to ASME VIII DIV 1.
2 Review the GA drawing & B.O.M and other documents.
3 Review procedures for the project and find any mistakes.
4 prepare project documents and report forms.
5 1st project 1512 completing step by step.
Day-2
1 Completing st project 1512 Nozzles fit up and welding.
2 Review PQR-WPS checks and Welding map.
3. check MTC and MRIR.
3 review 1511 project documents and step-by-step fabrication.
Day-3
1 petrochemical project document and step-by-step fabrication.
2 review BOM and material list and material selection.
3 pressure vessels fit up.
4 Radiographic test types.
Day-4
1 Ovality.
2 HI-LO Check.
3 RT Interpretation
4 ASME VIII DIV1