Udemy
    •  
    •  
    •  
    •  
    •  
    •  
    •  
    •  
Turn what you know into an opportunity and reach millions around the world.
Learn More
Your cart is empty.
Keep shopping
إستخدام البريمافيرا + الإكسيل فى تخطيط وإداره المشروعات
Rating: 4.5 out of 5(70 ratings)
863 students

إستخدام البريمافيرا + الإكسيل فى تخطيط وإداره المشروعات

How to use (Primavera P6 + Excel ) to perform full project planning step by step
Last updated 10/2025
English

What you'll learn

  • After joining this Course you will be able to : Create full project planning work by using (Primavera P6 & Excel) )
  • Create new project in Primavera P6 & Create project Calendar as per the contract & Create Project WBS (Work breakdown Structure ))
  • Create Project Activity list in excel & Import / Export from Primavera to Excel .
  • How to define project resource in primavera P6 (Resource Cost Loading) for each project activities and how to calculate budget total cost for the project as all
  • Define Project activities original duration , and learn what is the different types of activities relations , and How to define activities relations in P6.
  • How to Make schedule analysis to get project finish date and define the project critical path .
  • How to draw project S-curve by using earned value method & Critical Path Method
  • How to assign activities code and what is the benefit's of activity codes & How to assign project baseline
  • How to make progress update and compare (Schedule % Complete Vs. Performance % Complete)
  • By attending this course you will be familiar with Primavera P6 properties like (Bar chart editing ,Printing , User preference , Admin Preference )

Course content

20 sections49 lectures12h 36m total length
  • Introduction. Course Content. Planning best practice steps14:05

    خطوط عمل البرنامج الزمنى وكذلك الخطوات العمليه على برنامج البريمافيرا

  • How to install Primavera_P6 Professional 204:32

    كيفيه تحميل برنامج البريمافيرا وتثبيته على الجهاز بخطوات بسيطه جدا

Requirements

  • No previous experience is required ,Course is very sample

Description

1- Lec.01 Course Content Introduction.

2- Lec.02 How to define new project in primavera P6.

3- Lec.03 How to define project Work Breakdown Structure (WBS).

4- Lec.04 Hoe to define Project Calender.

5- Lec.05 How to define Project Activities from Bill of quantities (B.O.Q).

6- Lec.06 How to import activity list from excel to primavera p6.

7- Lec.07 How to import Cost Resources to the project activities.

8- Lec.08 How to import Man.Hrs Resources to the project activities. (Budget Labore Unit).

9- Lec.09 Implement activities original duration & relation between project activities.

10- Lec.10 How to Assign project Baseline.

11- Lec.11 View Activities and Resource Usage Spread sheet & Profiles.

12- Lec.12 How to export project S-Curve from primavera p6 to excel.

13- Lec.13 How to perform Project Progress update (Duration% + Physical %).

14- Lec.14 How to assign (Activity Code) for project activities.

15- Lec.15 Schedule Printing Options.

16- Lec.16 Primavera P6 Layouts, How to save specific layout in Primavera-P6.

17- Lec.17 Primavera Bar chart options.

18- Lec.18 Primavera P6 time scale modification.

19- Lec.19 Modify primavera settings Currency - Assistance wizard - Units – Time units.

Who this course is for:

  • This course is suitable for site engineers , Planning engineers , Construction Manager , Project Manager , PMO Enginner