Udemy
Turn what you know into an opportunity and reach millions around the world.
Learn More
Your cart is empty.
Keep shopping
Module 2 - Feasibility Study
New
Rating: 5.0 out of 5(6 ratings)
107 students

Module 2 - Feasibility Study

Module 2 of 10: EPC Project Documentation course
Last updated 11/2026
English
English [Auto],

What you'll learn

  • Explain the EPC project model and how a project moves from feasibility and FEED to detailed design, procurement, construction, commissioning and handover
  • Describe the roles of the Owner, EPC contractor, designers and suppliers, and the document interfaces between them
  • Apply document codes, revisions and statuses, and run review and approval cycles up to Issued for Construction (IFC)
  • Build and use registers for inputs, assumptions, deliverables and open items, so every decision can be traced to its source
  • Compare project options using agreed criteria, CAPEX, OPEX, lifecycle cost and cost estimate classes
  • Manage vendor documents, quality records, NCRs and field changes during procurement and construction
  • Prepare commissioning records and a complete handover dossier for the operations team
  • Follow one document from creation to handover and recognize the typical problems that cause rework and delay

Course content

1 section • 5 lectures • 1h 14m total length
  • Purpose of the Feasibility Study16:20

    Explain how early studies reduce uncertainty and help decision-makers choose whether to proceed, gather more information, revise the scope or stop.

  • Input Data and the Basis of the Study13:25

    Show how a project team turns an initial business request into a clear study question with documented inputs, assumptions, constraints and information gaps.

  • Project Options and Screening15:23

    Explain how teams develop realistic options and compare them consistently before recommending a preferred direction.

  • Pre-Project Studies and Supporting Documents13:50

    Connect early field and technical investigations with cost, schedule and risk information used to evaluate project feasibility

  • Investment Decision Package and Handoff to FEED15:14

    Bring the feasibility evidence together in a clear decision package and identify the information that should be carried into FEED

Requirements

  • No prior EPC or document control experience is needed. Every term is explained as it appears.
  • A general idea of how engineering or construction projects work is helpful, but not required
  • You only need a computer, tablet or phone to watch the lectures
  • Be ready to pause the video and answer the short self-check questions at the end of each lecture

Description

This course contains the use of artificial intelligence.

This module explains how an EPC project team evaluates a business need before detailed design begins. Learners follow early project development from defining the problem through gathering inputs, comparing alternatives, conducting pre-project investigations, evaluating cost, schedule and risk, and documenting a recommendation for an investment decision. The purpose is to clarify what is known, what remains uncertain and what evidence is needed before the project proceeds. A cooling water example shows how feasibility outputs become inputs to FEED.

Instead of abstract theory, the course uses one running example, a cooling water system, which grows from a stated need into a recorded decision, a design, purchased equipment, installed work and an as-built record. Along the way you will see filled samples of the documents that professionals actually use: document registers, input and assumptions registers, comment logs, transmittals, decision records and more. Each lecture ends with one key takeaway and one self-check question.

You will learn how to:

  • understand the roles of the Owner, EPC contractor, designers and suppliers, and the interfaces between them

  • apply document codes, revisions and statuses correctly

  • trace every conclusion and design decision back to its source

  • compare project options with clear criteria and cost estimate classes

  • manage vendor data, quality records, NCRs and field changes

  • assemble a complete handover dossier

The course is built from short, focused lectures with clear slides and narration. It is suitable for beginners and useful for experienced professionals who want a common vocabulary and a structured approach.

Who this course is for:

  • Project, discipline and design engineers who produce, review or approve project documents
  • Project managers, planners, procurement and construction staff who depend on correct, current documents
  • Document controllers and document control engineers who are starting out or moving into EPC projects
  • Owner representatives and operations and maintenance staff who receive handover documentation
  • Students and graduates preparing for a career in engineering, construction, oil and gas, power or industrial projects
  • This course is not a tutorial for a specific document management software, and it does not teach detailed engineering design.