
Explore lean thinking essentials for trade partners, including the five lean principles, the last planner and preplanning systems, and a four-step path to become lean ready.
Discover how lean fosters a culture of respect and listening, making teams stronger together across design and trades and improving the whole through collective problem solving.
Complete Exercise 1 video. After completing this video you will have met your coaches and know how to make short videos for your homework assignments.
This video is about the 5 principles of lean. It is important to know them. Why is it important to know who your customer is and what they value?
Why is lean construction different from Traditional construction?
Why is culture important on lean construction project?
Explore lean leadership in construction through exercises that define leadership as visionary, emphasize doing what you say you'll do, listening, collaboration, and eliminating waste to deliver customer value.
Learn to identify downtime waste—the eight lean wastes in construction (defects, waiting, non-utilization of talent, transportation, inventory, motion, extra processing)—to improve flow and deliver customer value.
Identify the waste of waiting in construction and counter it with early planning that ensures information, tools, materials, and equipment are available to keep trades productive.
Learn how non utilization of talent creates downtime; listen to workers, align the right people with the right processes, and use siwash continuous improvement and early planning to fix it.
discover how inventory waste drives downtime and masking problems, and learn just-in-time delivery, thoughtful planning, and prefabrication to reduce on-site inventory and improve project flow.
Identify extra processing waste by studying and standardizing construction processes with input from the crew. Slow down, discuss the best process, and apply countermeasures such as just-in-time delivery for materials.
Apply the five s system—sort, straighten, sweep, shine, standardize, sustain— to workplaces such as offices and warehouses, establishing lean foundations and continuous improvement through systematic organization.
This lecture explains the second s, straighten, as visual management that organizes tools and materials for efficiency, using labeling, shadow, and standardized layouts to sustain flow.
Learn to implement sweep and shine as part of the five S lean approach, establishing a daily clean-and-organize routine to standardize, sustain, and speed up production on site.
Standardize the fourth S by creating visual management, standardized layouts, and electronic standard work to enable continuous improvement, training, and scalable lean across projects.
Learn how sustaining five s means spreading standardized practices through training and leadership across the site. Follow the five s cycle—sort, set in order, shine, standardize, sustain—with checks for improvement.
Master the 5S exercise count the numbers by counting 1 to 30 in 15 seconds, then sort, categorize, remove, label, and standardize materials to create a visual, organized, efficient workplace.
Practice the five s approach by filming a before-and-after workspace transformation, applying sort, straighten, shine, standardize, and sustain with visual management, labeling, and daily sweeps.
Develop lean readiness before a job site by embracing humble, shared planning and identifying eight types of waste in your shop, with training from LCI, Lean Enterprise Institute, and co-ops.
Master the Last Planner System, a comprehensive construction planning tool that uses milestones, phase pull plans, and make-ready plans to reveal constraints and align trade partners for lean construction.
Master the last planner system to improve weekly work plans, remove constraints daily, and raise percent complete from about 40–50% toward 75–85% through collaborative six-week chunks with trade partners.
Apply the four step preplanning system—pace, prepare, and perform—to map upcoming work with all trades, using visualization and prefabrication concepts to boost efficiency and safety through early collaboration.
Define pace as a weekly production rhythm using a color-coded plan to align trades early with a holistic attack plan in lean construction.
Apply the p for framework to craft a perfect cup of coffee, detailing preparation, installation, pace, conditions of satisfaction, and countermeasures to deliver aroma, hot water, and fresh beans.
If you are a different trade, mechanical or plumbing, or framing, pick a phase of your work, use a drawing the represents your work for the entire phase and do a P4 Plan with it for your exercise.
Develop an energized ready plan for electrical distribution using a one-line diagram, pace planning, and color-coded tables to align electricians and PMs for early, safer power on.
Jeff Liker explains his long career studying Toyota's production and product development systems and argues that lean construction succeeds through people and problem solving, not mere tools.
Trace lean origins to the Toyota production system and the machine that changed the world, highlighting just-in-time, value-added flow, and building in quality to deliver on time.
Connect just-in-time, built-in quality with an orderly, well-labeled tool environment that helps you find what you need instantly, then apply craft knowledge to lead high-quality construction with lean practices.
Learn how lean thinking tackles a bold challenge to finish a building in half the time by breaking work into rooms and using one-piece flow with parallel teams.
Apply the scientific thinking approach by defining the objective, breaking problems into bite-size steps, and testing hypotheses through experiments to enable continuous improvement in lean construction.
Adopt a continuous improvement mindset grounded in scientific thinking to break problems into manageable pieces, maintain a cadence of checking, reflecting, and planning, and coach frontline workers to solve problems.
Start with a lean foundation model rather than the whole building to accelerate delivery with fewer resources and quality risk. Break the work into pieces for quick feedback.
Discover how cross-functional teams, with union agreements, complete a hospital room in four days by integrating plumbers, electricians, heating and ventilation, and carpenters, minimizing handoffs in lean construction.
Align lean deployment with an organic approach rooted in Toyota's respect for people and continuous improvement. Use just in time training and standardized work to shift toward the organic approach.
Lean construction becomes concrete when you move from abstract goals to on-the-job practice, and you learn more through bite-sized daily continuous improvement—half an hour a day—for months, like compound interest.
Paul Akers answers four questions about his construction industry experience, sharing lean construction leadership insights and referencing his book To Second Clean alongside the forthcoming book by George Tan.
Define lean as total participation and daily incremental improvements by all toward continuous value. See construction industry adoption at about five percent, with top leaders often absent from lean practice.
Embrace lean to boost joy and survival through continuous improvement in life and work. Cultivate an organization that constantly explores ideas and concepts to improve and survive.
Align trade partners around lean thinking by training 40,000 subcontractors, sending leaders to Japan, and establishing a dojo, ensuring contracts require lean mastery.
Nick Lauren shares decades of lean construction experience, from last planner and kanban to target value design, coaching teams, and leading integrated lean project delivery on major hospital projects.
Encourage trade partners to spend time on site observing workflows to improve safety and quality, and hire a lean coach to reduce waste, boost productivity, and enhance quality of life.
Trade partners boost project flow by arriving prepared for last planner meetings, presenting a clear weekly plan and constraints, fostering faster problem solving and smoother collaboration.
Bring trade partners together to run pull plans, visualize workflows, and co-create solutions through collaborative questioning that embeds lean culture and worker-led problem solving.
The construction industry is early in development, but on the leading edge of lean design and construction. Lean helps teams simplify work, improve daily life, and solve problems quickly.
Identify waste and barriers, then apply lean construction to optimize site logistics using the five s: sort, set in order, shine, standardize, sustain, for safer, more productive teamwork.
We invite trade partners worldwide to explore lean principles, connect with peers managing crews, and start a lean journey that improves quality of life and daily work.
George Zettl of Turner Construction shares his 15-year journey learning lean leadership from industry pioneers, and how coaching from Howell, Ballard, and others shaped his approach to helping teams.
Learn how to explain lean by identifying waste and simplifying processes to continuously improve daily work, whether at a desk or on a project.
Explore how 5S principles transform construction workflows by sorting, organizing, and standardizing tools and spaces, reducing treasure hunting and speeding task completion on Turner projects.
Less than five percent of traders understand the last planner system. Awareness grows unevenly as exercises bridge training gaps and contrast lean practice with old-school methods.
Teams typically see benefits of the last minor system after about two months of coaching. Another month or two helps them reach full understanding and apply it across daily work.
Turner trains teams in the last planner system through a phase full planning bootcamp, using parade of trades and wood block tower exercises to enable reliable handoffs and pool planning.
Cadence, or tact time, creates a drumbeat that sequences crews through areas with one trade at a time, signaling the next move and sustaining flow, as in a hospital corridor.
Turner could have started measuring production rates earlier, using observation circles to improve activities and tasks, and apply underground utility and steel production rate insights from Henderson Hospital.
I lean on the last planner system to finish projects on time and bring essential services closer to communities, as when a medical office building opened two months early.
George Zettl of Turner Construction shares his 15-year lean journey, coached by leaders Greg Howell, Glen Ballard, and Al Macumber, Roberto Sheron, shaping his approach to lean and teams.
Use observation circles to spot layout inefficiencies and miscommunications on the Temecula hospital project. Finish the project in record time by applying lean principles, boosting productivity and profitability.
Assess how far the construction industry has progressed on the lean journey, finding approximately five to ten percent progress amid ongoing waste reduction and process improvements.
Embrace lean to reduce waste, deliver full value of skills and services, and shorten project timelines so communities gain faster access to education, health care, and thriving businesses.
Align competing agendas of diverse specialists and trade partners by centering on customer requirements to serve more children and improve health care, adding value to the community.
Engage staff through Lane to address staffing and qualification challenges and improve quality of life as office and field teams enjoy work more and leave earlier.
This training will teach the P4 Planning system, which is a simple 4 step system designed to prepare yourself for a Last Planner System® phase pull planning session. P4 Planning visual planning allows trade partners to break down their work and assess if there are any improvements that they can make in their processes to improve themselves. Anytime a trade partner improves themselves, they save time, energy, and money for their bottom line. The value of P4 Planning is regardless of whether you are a traditional scheduling project or a lean Last Planner System® project, P4 planning will improve your efficiency.
But before we go into P4 Planning, we guide you through the Lean principles of Lean Construction, the 5S System, and the elimination of the 8 Waste. If you know the lean basics, this will be a refresher course for you. The goal of the course is to teach trade partners how to prepare themselves to manage their work installation process at a higher level of efficiency than ever before using lean principles and methods. They will see the waste in their processes and remove it. They will be Lean Leader on any type of project, traditional or Lean.