
Complete Exercise 1 video. After completing this video you will have met your coaches and know how to make short videos for your homework assignments.
This video is about the 5 principles of lean. It is important to know them. Why is it important to know who your customer is and what they value?
Why is lean construction different from Traditional construction?
Why is culture important on lean construction project?
Master the Last Planner System, a comprehensive construction planning tool that uses milestones, phase pull plans, and make-ready plans to reveal constraints and align trade partners for lean construction.
If you are a different trade, mechanical or plumbing, or framing, pick a phase of your work, use a drawing the represents your work for the entire phase and do a P4 Plan with it for your exercise.
Trace lean origins to the Toyota production system and the machine that changed the world, highlighting just-in-time, value-added flow, and building in quality to deliver on time.
The construction industry is early in development, but on the leading edge of lean design and construction. Lean helps teams simplify work, improve daily life, and solve problems quickly.
Learn how to explain lean by identifying waste and simplifying processes to continuously improve daily work, whether at a desk or on a project.
Explore how 5S principles transform construction workflows by sorting, organizing, and standardizing tools and spaces, reducing treasure hunting and speeding task completion on Turner projects.
Turner trains teams in the last planner system through a phase full planning bootcamp, using parade of trades and wood block tower exercises to enable reliable handoffs and pool planning.
This training will teach the P4 Planning system, which is a simple 4 step system designed to prepare yourself for a Last Planner System® phase pull planning session. P4 Planning visual planning allows trade partners to break down their work and assess if there are any improvements that they can make in their processes to improve themselves. Anytime a trade partner improves themselves, they save time, energy, and money for their bottom line. The value of P4 Planning is regardless of whether you are a traditional scheduling project or a lean Last Planner System® project, P4 planning will improve your efficiency.
But before we go into P4 Planning, we guide you through the Lean principles of Lean Construction, the 5S System, and the elimination of the 8 Waste. If you know the lean basics, this will be a refresher course for you. The goal of the course is to teach trade partners how to prepare themselves to manage their work installation process at a higher level of efficiency than ever before using lean principles and methods. They will see the waste in their processes and remove it. They will be Lean Leader on any type of project, traditional or Lean.