Learn the fundamentals of planning and scheduling a construction project by identifying scope, duration, milestones, priorities, resources, site and climatic conditions, and the specifications and construction methodology.
Plan a construction project by understanding the scope and nature of work, prioritizing the factory area and outlining the sequence from excavation to steel erection.
Explore start-to-start and finish-to-start links to coordinate overlapping construction activities, using earthwork, PCC work, formwork, reinforcement, and concreting to illustrate parallel scheduling.
Learn to prepare a baseline schedule for foundation works by sequencing excavation, footing, PCC, reinforcement, formwork, and concreting, while analyzing labor productivity and overlapping activities.
Develop a baseline schedule for columns up to the plinth beam by sequencing footing, reinforcement, starter concrete, column shuttering, and concreting, while adjusting for holidays and task overlaps.
Create a baseline schedule for plinth beams and backfilling works, coordinating excavation, PCC, shuttering, reinforcement, and concreting with planned overlaps to optimize site progress.
Develop a baseline schedule for the ground floor column, outlining starter concrete, reinforcement, backfilling, formwork, and concreting. Plan sequencing toward slabs and beams with overlaps and electrical conduit coordination.
Prepare the baseline schedule for the first floor column activities, detailing the sequence from starter concrete through reinforcement, formwork, and concreting, with finish-to-start links and intentional overlaps.
Prepare a baseline schedule for the first floor slab works, coordinating column concreting, beam installation, slab centering, reinforcement, and electrical works with overlaps to minimize delay.
construction projects are never easy. That's why this course has taken to carefully study it and make a schedule.
Planning is a vital project phase and it would take an enormous amount of time if it is done manually. So You have to understand the main concepts of planning first to plan any project successfully.
Project planning is inherently uncertain as it must be done before the project is actually started. Therefore, the duration of the tasks is often estimated through a weighted average of optimistic, normal, and pessimistic cases.
Learn to Prepare the Following Schedule with Ms - Excel
what is planning & scheduling of project
Understanding the Scope & Nature of the Project
Understanding start to start and finish to start link
Prepare Baseline Schedule for Foundation works
Prepare Baseline Schedule for Column Upto Plinth Beam
Prepare Baseline schedule for Plinth Beams & Backfilling works
Prepare Baseline Schedule for Ground floor column , Roof Beams & Slabs
Prepare baseline Schedule for First Floor column Activites
Prepare Baseline schedule for 1st floor slab works
Project planning is inherently uncertain as it must be done before the project is actually started. Therefore, the duration of the tasks is often estimated through a weighted average of optimistic, normal, and pessimistic cases.
Then the necessary resources can be estimated and costs for each activity can be allocated to each resource, giving the total project cost. At this stage, the project schedule may be optimized to achieve the appropriate balance between resource usage and project duration to comply with the project objectives.