Map the owner, designer, general contractor and subcontractors; distinguish preparation, review and decision authority.
Create a work breakdown structure (WBS), scope statement, assumptions and interface questions for one construction project.
Tools in this lecture — 26: 1 HTML working file (Project scope workbook); 9 editable working parts: Project; Participants; Phase handoffs; Delivery arrangement; Responsibilities; WBS dictionary; Scope statement; Assumptions and interfaces; Readiness review.
Ready to use on the slides — 16: Project identity card; Participant working card; Phase handoff record; Document revision register; Handover evidence index; Contract route checklist; Delivery arrangement record; Role responsibility card; Interface issue record; Written delegation check; WBS leaf dictionary; Package scope boundary; Coverage checklist; Scope statement with assumption and question logs; Acceptance evidence record; Scope release readiness record.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Connect quantity-based estimating, named allowances, code budgets and separate contract-price and performance-cost bases.
Record incurred costs, remaining commitments, forecast, variance, payment timing and retainage on one reporting date.
Tools in this lecture — 30: 1 HTML working file (Construction cost workbook); 10 editable working parts: Basis; Estimate; Allowances; Code budgets; Commitments; Cost forecast; Changes and reserve; Cash flow; Billing and retainage; Review and actions.
Ready to use on the slides — 19: Budget basis card; Cost authorization and performance budget calculation; Estimate basis record; Quantity-rate row and item-cost calculator; Rate scope checklist; Exact quantity conversion note; Direct-cost sum calculator; Named allowance bases and price composition; Code allocation record; Approved budget change record; Reserve movement record; Budget release checklist; Cost report with remaining commitment and forecast calculation; Forecast variance and remaining cost calculation; Variance action record; Period cash ledger with cumulative cash calculations; Cash forecast action card; Billing basis with retainage and current request calculation; Cost review release checklist.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Calculate early and late dates, the critical path and total versus free float from a linked activity network.
Connect milestones and long-lead deliveries to a three-week look-ahead and frozen weekly promises.
Tools in this lecture — 30: 1 HTML working file (Schedule and Weekly Plan); 10 editable working parts: Project and calendar; Activity register; Dependencies; Forward pass; Backward pass; Paths and float; Milestones and deliveries; Three-week readiness; Weekly promises; Status and checks.
Ready to use on the slides — 19: Activity register row; Duration basis card; Network logic checklist; Early start calculator; Early finish calculator; Terminal finish calculation; Late finish calculator; Late start calculator; Backward target card; Pass validation checklist; Critical path duration calculation; Total float calculator; Free float calculator; Float action card; Milestone register; Delivery readiness and release record; Three-week readiness with release checklist; Weekly commitment register and PPC; Activity update and review record.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Define construction subcontract packages and interfaces, then compare quotations on the same scope using bid leveling.
Record project buyout against budget, long-lead releases, submittal decisions and subcontractor handoffs.
Tools in this lecture — 30: 1 HTML working file (Buyout and Procurement Plan); 10 editable working parts: Project and basis; Package register; Scope and interfaces; Project readiness; Bid leveling; Award and buyout; Long-lead log; Submittal calendar; Handoffs and actions; Readiness and report.
Ready to use on the slides — 19: Package scope sheet; Interface ownership record; Document revision register; Package budget reconciliation; Package release checklist; Project readiness evidence record; Readiness decision and gap route; Scope inclusion comparison; Comparable bid calculator; Scope clarification request; Award recommendation record; Award variance calculator; Procurement forecast worksheet; Award decision record; Long-lead release and delivery log; Submittal calendar and submit-date calculator; Resubmission action record; Release evidence checklist; Package handoff and action register.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Route a request for information (RFI), review the answer and retain issued references and site receipt evidence.
Assess change scope, price and network impact; distinguish pending proposals, authorized change orders and implementation.
Tools in this lecture — 29: 1 HTML working file (RFI and Change Control Pack); 10 editable working parts: RFI intake; RFI route; Response review; Change intake; Scope assessment; Price assessment; Schedule assessment; Approval record; Implementation record; Change status report.
Ready to use on the slides — 18: RFI intake form; Supporting-evidence record; Response-route record; Receipt and response-target record; Response adequacy checklist; Reply-distribution record; Impact triage and handoff; Change scope assessment; Submitted change request; Change valuation worksheet; Schedule impact worksheet; Cost authorization calculator; Approval evidence record; Approved-price and proposal-exposure report; Change version register; Rejected-change record; Implementation and site issue checklist; Next-action status report.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Create a dated daily report for crews, equipment, work, deliveries, weather and observed events.
Coordinate site logistics, an inspection and test plan, acceptance evidence and nonconformance correction with qualified reviewers.
Tools in this lecture — 29: 1 HTML working file (Site Control Pack); 10 editable working parts: Day record; Crews and equipment; Work and quantities; Deliveries and condition; Events and evidence; Site logistics; Inspection and test plan; Acceptance checks; Nonconformance register; Day review and handoff.
Ready to use on the slides — 18: Daily-report header; Observation-source register; Weather observation record; Daily review checklist; Crew record and person-hours calculator; Equipment use record; Work quantity record; Delivery and condition record; Event and interruption record; Evidence-link matrix; Report correction register; Delivery-slot and route plan; Storage-zone and logistics review register; Inspection and release plan; Acceptance and test record; Nonconformance/correction/verification pack; Work-release record; Issued-report and next-day handoff.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Record construction risks, expected cost and task-delay exposure, responses, triggers, owners and reserve movements.
Coordinate an overview site safety plan, specialist readiness, induction, observations and follow-up; detailed safety practice remains with specialists.
Tools in this lecture — 29: 1 HTML working file (Construction Risk and Safety Planner); 10 editable working parts: Project scope; Risk register; Assessment evidence; Responses and triggers; Exposure review; Reserve ledger; Safety roles and plan; Specialist readiness; Induction and coordination; Observations and follow-up.
Ready to use on the slides — 18: Risk scope and register form; Assessment evidence card; Owner, response and trigger card; Expected monetary impact calculation; Expected task-delay calculation; Expected additional cost total; Exposure review row; Reserve request; Reserve ledger with balance; Probability impact review matrix; Estimate reconciliation; Safety roles and plan index; Specialist readiness and changed-work gate; Site induction record; Work interface plan; Observation and corrective action workflow; Incident referral record; Emergency, hold and plan-release checks.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
Calculate earned value measures and a selected completion forecast, keeping a contract payment application on its own basis.
Track milestones, punch correction and verification, handover receipts, open closeout gates and next-project learning.
Tools in this lecture — 31: 1 HTML working file (Progress and Closeout Pack); 10 editable working parts: Report setup; Baseline and measurement; Actual costs; Earned value report; Forecast and actions; Payment application; Milestones; Punch list; Handover package; Closeout and learning.
Ready to use on the slides — 20: Report cutoff and cost baseline card; Measured progress record; Posting and accrual reconciliation; Planned value calculation; Earned value calculation; Actual cost calculation; Earned completion calculation; Cost and schedule variance pair; Cost and schedule efficiency pair; Milestone review card; Estimate at completion calculation; Forecast assumption card; Estimate to complete calculation; Variance at completion calculation; Required efficiency to original BAC; Payment basis and application table; Location-based punch list with verification; Handover register with receipts; Final closeout gate checklist; Project result and learning record.
Explained models add 0 to the tool count; repeated demonstrations and calculations within a bundled tool are counted once.
This course contains the use of artificial intelligence
234 practical tools across one construction project: 8 working files, 79 editable working parts and 147 ready-to-use presentation tools.
One fictional medical office building connects every scope decision, cost forecast, delivery, change and handover record.
A site question arrives before its drawing reference is confirmed. A subcontract quotation excludes an interface, while the schedule assumes the package is ready. When each record uses a different date or version, unresolved work can disappear from the report until it interrupts the next handoff.
A connected document set gives the next review a clear starting point: the work boundary, the amount, the activity, the evidence and the person responsible for the decision. Missing inputs remain visible. A payment request stays separate from a receipt, and a correction stays separate from verification. The practical change is a more traceable review conversation and fewer decisions resting on an undocumented assumption.
What is inside, counted by type
The 234 count combines files, their working parts and presentation tools. Related documents are shown in both editable and presentation formats; repeated demonstrations and repeated substitutions within one calculation are counted once. Models that are only explained do not add to the count. There are 16 downloadable resources: 8 lecture presentations and 8 HTML files, not 234 separate downloads.
Where the tools sit in the project
A consistent example, with clear limits
Construction Manager Nora coordinates a fictional three-storey medical office building for a small or medium general contractor. Its original fixed-price contract is $14,400,000 and its baseline schedule is 60 weeks. Rates, percentages and calendar assumptions are example numbers rather than market benchmarks or universal requirements. The calculations use checked methods and consistent project data. Smaller-job and owner-side variations keep the documents adaptable without changing their purpose.
This is a management course, not engineering or legal instruction. Technical design, local building rules, contract decisions and specialist safety judgments remain with qualified project professionals. Check your contract and local rules. Detailed occupational safety, BIM modelling, software setup, operation after handover and exam preparation are outside the course. Reconstructed interface demonstrations are labelled mockups; they do not imply vendor affiliation or certification. No personal construction career or engineering qualification is claimed for the instructor.
Who is teaching
Mike teaches business courses. His wider teaching work has 1,800,000+ course enrollments and 170,000 students on Udemy, and he is the author of about 200 books on Amazon. These are teaching credentials, not construction qualifications. This course brings verified management methods into usable project documents, with fictional examples instead of personal site stories.
How the course runs
First comes the project boundary and responsibility map, followed by the estimate and dated cost report. The next stage connects a critical path schedule to subcontract packages, comparable bids and delivery dates. During construction, RFI responses and changes sit beside daily observations, quality evidence and risk actions. Finally, a dated progress report leads into a separate payment basis, a location-based punch list and the package handed to the owner. Each lesson ends with one document-based practical assignment.
What is included
The next package release or progress review will arrive on its own schedule. Open the scope record now and make one unresolved boundary visible before the next handoff. Enroll now and start your first lesson today.