Learn to create a professional baseline schedule step by step, using P-Six, to plan activities, define logic, build a work breakdown structure, and assess resources and costs for project execution.
Explore the five project management process groups and the planning focus for time schedules. Define activities, sequence activities, estimate resources and durations, and develop a schedule.
Define and plan project scope, determine what is included or excluded, and build a work breakdown structure that decomposes deliverables into work packages for the baseline schedule.
Identify a work breakdown structure as the decomposition of the project scope into a hierarchical, deliverable-focused framework that supports budgeting and baseline scheduling.
Create a work breakdown structure (WBS) to develop a professional baseline schedule, organizing contracts, tender documents, and drawings to guide project planning and priorities.
Develop a workable work breakdown structure by decomposing a project into components, defining level-specific work packages, and ensuring unique deliverables with a 4 percent budget rule.
Explore ways to build a work breakdown structure for a baseline schedule, using historical data and multiple approaches - physical space, phased, by components, and a structured numbering system.
Develop a practical WBS in Primavera P6 for a construction project by creating a down structure with milestones, break-down elements, and a visual chart format for an initial baseline schedule.
Identify activities as the smallest work items in the work breakdown structure to build a practical baseline schedule and clarify who identifies them.
Define and manage activity information in a professional baseline schedule by assigning unique IDs, accurate descriptions, timings, resources, calendars, and relationships to each activity.
Estimate activity duration by considering available resources, materials, equipment, and site conditions; factors such as space, supervision, learning curve, design complexity, coordination, and weather shape the timeline.
Calculate activity duration by dividing quantity by production rate, using data from sources and previous projects, and apply optimistic, most likely, and pessimistic estimates.
Build an activity list from the work breakdown structure and calculate durations using quantity over rate, populating a table with descriptions, quantities, units, equipment, and milestones like concrete foundation.
Learn how to add activities in Primavera P6, create milestones with zero duration, and assign activities to the work breakdown structure with correct IDs and durations.
Create a resource list for the baseline schedule by identifying labor, equipment, and materials with costs, labeling items with IDs, and allocating resources to activities.
Explore how to add resources in Primavera P6, define resource types such as equipment, material, and labor, set calendars and unit measures, manage pricing, and assign resources to activities.
Explore predecessor and successor logic to link activities, define finish-to-start, start-to-start, and finish-to-finish relationships, and build a predictive network schedule that guides project execution.
Explore a practical example of creating a professional baseline schedule by linking activities in a work breakdown structure and Gantt chart using finish-to-start relationships.
Learn to design calendars and assign them to activities and resources, defining working hours, holidays, and weekends, and set a default calendar for a project.
Identify the critical path by linking activities and calculating early and late start and finish, using total float to flag critical activities for the baseline schedule with calendar working days.
Analyze the critical path under a 20-day project deadline. Explore how constraints affect activities B and C and adjust relation between B and C or resources to finish on time.
Identify how open ends and dangling activities affect project networks, and apply proper predecessors, successors, and start-to-start or finish-to-finish relationships.
Take a tour of primavera p6 to build and present a professional baseline schedule by exploring table and gantt chart areas, filters, milestones, and the critical path.
Explore how to submit a professional baseline schedule by detailing content, milestones, construction sequence, assumptions, constraints, and long‑lead items, with two-volume submittals and resource planning.
Link theoretical project management to an electrical example by building a baseline schedule with a work breakdown structure, activities, resources, relationships, calendars, the critical path, then prepare the baseline submittal.
Explore books and references used in scheduling practice for project management, including standards and government sources, and methods for assessment and evaluation of the schedule in building construction.
Baseline schedule is a key factor for project success. Creating a professional baseline schedule is not an easy task as its required knowledge, effort, technique, cooperation with different key persons in the project and supporting documents. In this course, we will know how to create a professional baseline schedule based on knowledge of project management basis and practical examples step- by step
Build a powerful knowledge and skills to create a realistic professional baseline schedule
Course overview
This course is a roadmap for planning engineer to create a baseline schedule in a professional manner.
In addition, this course covers in important branch of project management knowledge.
In this course, I have tried to link the theoretical basis of project management together with practical example that we meet in a real project.
This course is designed to cover different areas that related to baseline schedule.
Student who completes this course will be able to build a professional baseline schedule in an organized manner based on sound sources of information and cooperation with key persons in the project, as well as knowledge of dealing with different sources of information and project documents