Learn how to perform BIM reviews beyond clash detection, including technical and coordination checks, BIM reviews, and beam execution plan compliance, using Navisworks clash detection.
create a project-specific clash matrix for meb and electrical with architecture and structure, defining vertical items like ducts and pipes and horizontal items like doors, walls, ceilings, and foundation.
Explore the Autodesk Navisworks interface and its clash detection tools, including clash matrix, clash detective, selection tree and properties, to guide novices.
Navigate the Navisworks interface, load Revit-exported NWC models, view element properties, and control visibility with hide/unhide and select options like by element or by rectangle.
Explore clash detection workflows in Navisworks using save search to create sets for ducts and pipes that update with Revit, contrasting with save selection, and ensure clash matrix reflects changes.
Learn to navigate and review models in Navisworks using enable sectioning, section boxes, and fit selection to focus on specific areas, while moving, rotating, and scaling views for precise coordination.
BIM Coordinator (BIM Consultant Review with Revit & Navisworks)
Learn How to Review the BIM Model, how to be Consultant Reviewer, Learn Navigation & Clash Detection in Navisworks
Autodesk Navisworks Manage 2023 Course Contents:
1- Autodesk Navisworks Manage Introduction
2- Autodesk Navisworks Manage Navigation
3- Autodesk Navisworks Manage Reviewing the Models
4- Autodesk Navisworks Manage Clash Detective
BIM Consultant Review (How to be Consultant BIM Engineer & BIM Coordinator)
1- Consultant BIM Engineer or Coordinator
2- BIM Submission
3- Types of Review
4- Technical Review (Navisworks Navigation)
5- BIM Review
6- Clash Detection (Navisworks Clash detection)
BIM Review
1- Not loaded models
2- Missing cover Page
3- Views naming (Manage Project Browser)
4- Unassigned views
5- Families naming (Naming Convention must be as per BEP)
6- Remove Unused Elements
7- Units to be as per BEP
8- Missing Location
9- Avoid critical Warnings
10- Required LOD
11- Check No Level Elements
12- Remove centerline
Tech & Coordination Review
1- Services as per IFC
2- Accessibility (Valves-FCU-AHUs-Panels-CT)
3- Clear Hight
4- Water Services above Electrical Services
5- Water services passing through Electrical rooms
6- Electrical Rooms with water FF system
7- LOD (Material Submittal)
8- Access Doors (Coordinated between Arch & MEP)
9- Exposed MEP Services
10- Check insulation thickness & Lining
11- Services under ceiling
Clash detection
Clash Matrix & How to use Navisworks for clashes