Udemy
    •  
    •  
    •  
    •  
    •  
    •  
    •  
    •  
Turn what you know into an opportunity and reach millions around the world.
Learn More
Your cart is empty.
Keep shopping
BEE Paper 4:Energy Assessment for Equipment & Utility System
Rating: 4.1 out of 5(5 ratings)
40 students

BEE Paper 4:Energy Assessment for Equipment & Utility System

OSS Academy Guide to your sustainable learnings
Created byOSS Academy
Last updated 5/2024
English

What you'll learn

  • Unit No. 01: Energy Performance Assessment Of Boilers
  • Unit No. 02: Energy Performance Assessment Of Furnaces
  • Unit No. 03: Energy Performance Assessment Of Cogeneration Systems With Steam And Gas Turbines
  • Unit No. 04: Energy Performance Assessment Of Heat Exchangers
  • Unit No. 05: Energy Performance Assessment Of Motors / Variable Speed Drives
  • Unit No. 6: Energy Performance Assessment Of Fans And Blowers
  • Unit No. 07: Energy Performance Assessment Of Water Pumps
  • Unit No. 08: Energy Performance Assessment Of Compressors
  • Unit No. 09: Energy Performance Assessment Of HVAC Systems
  • Unit No. 10: Energy Performance Assessment Of Lighting Systems
  • Unit No. 11: Performing Financial Analysis
  • Unit No. 12 Performance Assessment Of Thermal Power Stations
  • Unit No. 13 Performance assessment of Steel Sector
  • Unit No. 14: Performance Assessment of Cement Industry
  • Unit No. 15: Performance Assessment of Buildings and Commercial Establishments
  • Unit No. 16: Performance Assessment of Textile Industry
  • The Indirect Method Testing in Boilers
  • Measurements Required for Performance Assessment Testing for Boilers
  • Typical Instruments used for Boiler Performance Assessment
  • Boiler Efficiency by Indirect Method: Calculation Procedure and Formula
  • Data Collection Format for Boiler Performance Assessment
  • Format sheet for boiler efficiency testing
  • Example on Boiler Efficiency
  • Energy Performance Assessment Of Furnaces
  • Heat Balance of a Furnace
  • Thermal Efficiency of the furnace
  • Data Collection Format for Furnace Performance Assessment
  • Example on Energy Performance Assessment Of Furnaces
  • Steam Turbine and Gas Turbine Performance
  • Example on Steam Turbine and Gas Turbine Performance
  • Energy Performance Assessment Of Heat Exchangers
  • Overall heat transfer coefficient, U
  • Parallel Flow and Counter Flow Heat Exchangers
  • Example on Parallel Flow and Counter Flow Heat Exchangers
  • Energy Performance Assessment Of Motors / Variable Speed Drives
  • Format for Data Collection in Motors
  • Calculations on percentage loading on Motors
  • Energy Performance Assessment Of Fans And Blowers
  • Calculation of Fan Efficiency
  • Example on Energy Performance Assessment Of Fans And Blowers
  • Energy Performance Assessment Of Water Pumps
  • Example on Energy Performance Assessment Of Water Pumps
  • Energy Performance Assessment Of Compressors
  • Calculation of Free Air Delivered by Compressor
  • Calculation of Isothermal Power of Compressor
  • Calculation of Volumetric Efficiency of Compressor
  • Example on Energy Performance Assessment Of Compressors
  • Energy Performance Assessment Of HVAC Systems
  • Calculation of Heat Load
  • Example on Energy Performance Assessment Of HVAC Systems
  • Energy Performance Assessment Of Lighting Systems
  • Performing Financial Analysis in Energy Auditing
  • Performance Assessment Of Thermal Power Stations
  • Gross Heat rate and Net Heat rate calculation
  • Efficiency Calculation of Thermal Power Stations
  • Calculation of Turbine Heat Rate
  • Calculation of Turbine Cycle Efficiency
  • Important Formulae For Coal Mills
  • Calculation of Condenser Heat Load and Effectiveness
  • Example on Performance Assessment Of Thermal Power Stations
  • Performance assessment of Steel Sector
  • Process Flowchart of an Integrated Steel Plant
  • Example on Performance assessment of Steel Sector
  • Performance Assessment of Cement Industry
  • Process Flowchart of Cement Industry
  • Example on Performance Assessment of Cement Industry
  • Performance Assessment of Buildings and Commercial Establishments
  • Energy Performance Index (EPI) & Average Annual hourly energy performance index (AAHEPI))
  • Sources of Heat Gain into the building Space
  • Example on Performance Assessment of Buildings and Commercial Establishments
  • Performance Assessment of Textile Industry
  • Textile Manufacturing Processes
  • Wet Processing of Woven Cotton Fabrics
  • Working of Stenter
  • Calculation of Dryer Efficiency
  • Example on Stenter Efficiency/Textile Industry

Course content

16 sections50 lectures4h 59m total length
  • Unit No. 1 Lesson 13:36
  • Unit No. 1 Lesson 22:06
  • Unit No. 1 Lesson 32:13
  • Unit No. 1 Lesson 41:47
  • Unit No. 1 Lesson 513:42
  • Unit No. 1 Lesson 64:11
  • Unit No. 1 Lesson 73:05
  • Unit No. 1 Lesson 821:45

Requirements

  • No prior experience is needed. You will learn everything about BEE Paper 4 Energy Assessment for Equipment & Utility System in this course.

Description

In this course you will learn following topics in details:

  1. Unit No. 01: Energy Performance Assessment Of Boilers

  2. Unit No. 02: Energy Performance Assessment Of Furnaces

  3. Unit No. 03: Energy Performance Assessment Of Cogeneration Systems With Steam And Gas Turbines

  4. Unit No. 04: Energy Performance Assessment Of Heat Exchangers

  5. Unit No. 05: Energy Performance Assessment Of Motors / Variable Speed Drives

  6. Unit No. 6: Energy Performance Assessment Of Fans And Blowers

  7. Unit No. 07: Energy Performance Assessment Of Water Pumps

  8. Unit No. 08: Energy Performance Assessment Of Compressors

  9. Unit No. 09: Energy Performance Assessment Of HVAC Systems

  10. Unit No. 10: Energy Performance Assessment Of Lighting Systems

  11. Unit No. 11: Performing Financial Analysis

  12. Unit No. 12 Performance Assessment  Of Thermal Power Stations

  13. Unit No. 13 Performance assessment of Steel  Sector

  14. Unit No. 14: Performance Assessment of Cement Industry

  15. Unit No. 15: Performance Assessment of Buildings and Commercial Establishments

  16. Unit No. 16: Performance Assessment of Textile Industry

  • The Indirect Method Testing in Boilers

  • Measurements Required for Performance Assessment Testing for Boilers

  • Typical Instruments used for Boiler Performance Assessment

  • Boiler Efficiency by Indirect Method: Calculation Procedure and Formula

  • Data Collection Format for Boiler Performance Assessment

  • Format sheet for boiler efficiency testing

  • Example on Boiler Efficiency

  • Energy Performance Assessment Of Furnaces

  • Heat Balance of a Furnace

  • Thermal Efficiency of the furnace

  • Data Collection Format for Furnace Performance Assessment

  • Example on Energy Performance Assessment Of Furnaces

  • Steam Turbine and Gas Turbine Performance

  • Example on Steam Turbine and Gas Turbine Performance

  • Energy Performance Assessment Of Heat Exchangers

  • Overall heat transfer coefficient, U

  • Parallel Flow and Counter Flow Heat Exchangers

  • Example on Parallel Flow and Counter Flow Heat Exchangers

  • Energy Performance Assessment Of Motors / Variable Speed Drives

  • Format for Data Collection in Motors

  • Calculations on percentage loading on Motors

  • Energy Performance Assessment Of Fans And Blowers

  • Calculation of Fan Efficiency

  • Example on Energy Performance Assessment Of Fans And Blowers

  • Energy Performance Assessment Of Water Pumps

  • Example on Energy Performance Assessment Of Water Pumps

  • Energy Performance Assessment Of Compressors

  • Calculation of Free Air Delivered by Compressor

  • Calculation of Isothermal Power of Compressor

  • Calculation of Volumetric Efficiency of Compressor

  • Example on Energy Performance Assessment Of Compressors

  • Energy Performance Assessment Of HVAC Systems

  • Calculation of Heat Load

  • Example on Energy Performance Assessment Of HVAC Systems

  • Energy Performance Assessment Of Lighting Systems

  • Performing Financial Analysis in Energy Auditing

  • Performance Assessment  Of Thermal Power Stations

  • Gross Heat rate and Net Heat rate calculation

  • Efficiency Calculation of Thermal Power Stations

  • Calculation of Turbine Heat Rate

  • Calculation of Turbine Cycle Efficiency

  • Important Formulae For Coal Mills

  • Calculation of Condenser Heat Load and Effectiveness

  • Example on Performance Assessment  Of Thermal Power Stations

  • Performance assessment of Steel  Sector

  • Process Flowchart of an Integrated Steel Plant

  • Example on Performance assessment of Steel  Sector

  • Performance Assessment of Cement Industry

  • Process Flowchart of Cement Industry

  • Example on Performance Assessment of Cement Industry

  • Performance Assessment of Buildings and Commercial Establishments

  • Energy Performance Index (EPI) & Average Annual hourly energy performance index (AAHEPI))

  • Sources of Heat Gain into the building Space

  • Example on Performance Assessment of Buildings and Commercial Establishments

  • Performance Assessment of Textile Industry

  • Textile Manufacturing  Processes

  • Wet Processing of Woven Cotton Fabrics

  • Working of Stenter

  • Calculation of Dryer Efficiency

  • Example on Stenter Efficiency/Textile Industry

Who this course is for:

  • Exam aspirants of Bureau of Energy Efficiency Energy Auditor
  • Exam aspirants of Bureau of Energy Efficiency Energy Manager
  • Mechanical Engineers
  • Civil Engineers
  • ExTC Engineers
  • Electrical Engineers
  • Energy Engineers
  • Energy Consultants