Udemy
Turn what you know into an opportunity and reach millions around the world.
Learn More
Your cart is empty.
Keep shopping
Asta Powerproject for Building Information Modelling
Rating: 4.3 out of 5(7 ratings)
15 students

Asta Powerproject for Building Information Modelling

Learn the latest innovation - 4D virtual construction scheduling and project management
Last updated 10/2017
English
English [Auto],

What you'll learn

  • Link single and multiple IFC Files in Asta PP
  • Display and position IFC Pane, properties pane and categories pane
  • Specify the appearance of an IFC model
  • Override colors with material option
  • Navigate around the model in orthogonal mode
  • Walk through in the IFC model
  • Take snapshots of IFC models
  • Save an IFC model snapshots as images
  • Associate IFC model objects with tasks using IFC product searches
  • Create tasks with IFC Search
  • IFC search timeline simulation
  • IFC selection
  • IFC selection addition
  • Associate model objects with existing tasks using IFC search and IFC selection
  • Associate IFC model objects with tasks according to name, code library or WBS code
  • Associate IFC model objects using project templates
  • Ensure that all of the objects in an IFC model are associated with tasks
  • Specify the IFC task type and behavior to tasks
  • Add custom properties to IFC model elements
  • Revison management
  • Split objects in an IFC model
  • Merge objects in an IFC model
  • Copy split and merge data to a different revision of an IFC file
  • Compare progress against 3D window
  • Create timeline simulations videos and add fly pasts
  • Filter bars and tasks with BIM criteria

Course content

1 section • 32 lectures • 1h 49m total length
  • Interface and link single IFC file6:46

    Navigate the interface and learn to link a single IFC file via configuration, locating the local file, and loading the IFC model painter in the project.

  • Link multiple IFC files to Asta3:38

    Link multiple IFC files into a single Asta project by creating a model group and selecting architectural, electrical, mechanical, plumbing, and structural disciplines.

  • Display and position IFC Model Pane1:59

    Discover how to display and position the IFC model pane in Asta Powerproject, including pinning, sizing, and docking it to left, right, or bottom for multi-monitor setups.

  • IFC Properties Pane1:34

    View object data with the IFC properties pane in a BIM model. See location, height, width, cross section area, wall length, base quantities, and color; adjust pane position and size.

  • IFC Categories Pane2:22

    Use the IFC categories pane to filter model objects by type or location and control visibility, while assigning elements to categories for scheduling and ensuring correct location associations.

  • Associate IFC model with multiple files0:50

    Associate the same IFC model with multiple files and use it across different projects, enabling independent schedules; remember to reselect the IFC model when switching between files.

  • Specify the appearance of an IFC model2:46

    Override object colors in an IFC model by category, using model properties or right-click options to set background, transparency, and shading, and restore original colors by removing overrides.

  • Override colors with material option1:32

    Apply the material option to override colors and differentiate walls by materials such as brick, fabric, or plaster, coloring specific faces to show differences within the same entity type.

  • Navigate around the model in orthogonal mode1:38

    Navigate the model in orthogonal mode by orbiting around a pivot at the roof center, zoom with the mouse wheel, and pan with the right button.

  • Walk through in the IFC model using perspective mode1:43

    Walk through IFC model in perspective mode, switch by selecting perspective from the model or by clicking perspective option, and use left and right mouse buttons to turn and move.

  • Save camera points as snapshot3:08

    Save and organize camera points as snapshots in the BIM workflow by using model snapshot categories, library explorer, and comments to quickly return to predefined viewpoints.

  • Save IFC model views as images0:55

    Save IFC model views as images by exporting viewer snapshots, naming the image, selecting the type, saving to desktop, and sharing via email with project stakeholders.

  • Associate IFC model objects with tasks using IFC product searches13:35

    Create a project schedule by associating activities with IFC model objects using product searches and manual selections, building level-specific criteria for exterior walls, beams, columns, foundations, and windows.

  • Create tasks with IFC Search2:15

    Create and organize tasks in Asta Powerproject using IFC search, drag-and-drop, and shift-select methods; link tasks, set durations, and establish logical relations for external walls, windows, and superstructures.

  • Run timeline simulation1:20

    Run a timeline simulation by configuring time units, duration, and speed in the timeline settings, then start the timeline to build objects per created logic via the IFC model pane.

  • Associate IFC model objects with tasks using IFC product selection3:25

    Learn to associate IFC model elements with tasks using IFC product selection, create and name selections in library explorer, and add or remove selections to build task-linked bar charts.

  • IFC selection update1:47

    Learn how to manage IFC selections within an activity by adding walls to the existing selection, overwriting, or creating a new IFC product selection via drag-and-drop.

  • Associate model objects with existing tasks using IFC search and IFC selection3:14

    Learn to link existing schedule tasks to IFC model elements using drag-and-drop or IFC search and selection, or build the schedule from the IFC model, with warnings for unlinked items.

  • Associate IFC model objects with tasks according to name, code library or WBS co4:32

    Assign IFC products automatically to tasks by matching on name, code library, or WBS within the model group. Choose scope and overwrite options to apply or preserve existing assignments.

  • Tracking tasks and IFC model elements on bar chart and IFC model pane2:29

    Learn to link 3D model elements with bar chart activities in Asta Powerproject for building information modelling using tracking options, camera movement, and highlights in the IFC model pane.

  • Create templates for BIM7:13

    Create and reuse BIM templates in Asta Powerproject to manage library objects across projects, using IFC products and search criteria to assign types and link activities to the schedule.

  • Ensure that all of the objects in an IFC model are associated with tasks6:29

    Activate task selection to display elements linked to chosen activities. Assign IFC products via the library explorer and filter by contractor to ensure all objects are associated with tasks.

  • Assign IFC task type and behavior to tasks3:30

    Assign IFC task types and behaviors to tasks in the timeline to control 3D visibility for construction, maintenance, renovation, and existing elements, with exterior walls as examples.

  • Add custom properties to IFC model elements3:09

    Add custom properties to IFC model elements in Asta Powerproject for building information modelling; annotate objects with descriptions and tier 1 properties, like left and right slips at level 6.

  • Revision management2:17

    Learn revision management in building information modeling by upgrading IFC files to the latest version, exporting and importing IFC models, and updating schedules while preserving links.

  • Split objects in an IFC model7:39

    split objects in an ifc model into smaller parts using the split function, in x, y, and z directions, to reflect tasks like roof insulation, timelines simulation, and building codes.

  • Merge objects in an IFC model0:59

    Select and split components in an IFC model, resample parts, and assign separated objects to individual tasks, reflecting changes in the timeline simulation while creating various combinations.

  • Copy split and merge data to a different revision of an IFC file1:07

    Copy, split, and merge data across different revisions of an IFC file, applying splits to exterior walls, and preserving data, custom properties, and relationships.

  • Compare progress against 3D window4:22

    Use timeline simulation to compare live data against baseline in a 3d IFC model, highlighting delays with color codes, and saving comparison images for documentation.

  • Create timeline simulations videos and add fly pasts5:33

    Create timeline simulations and fly past animations in Asta Powerproject by defining flightpath points, linking them to tasks or data dates, and updating viewpoints with camera movements.

  • Filter and sort tasks with BIM criteria2:35

    Filter and sort tasks in Asta Powerproject using BIM criteria, applying IFC task types such as construction and renovation, and group activities by task type or IFC product.

  • Create video for timeline simulation3:29

    Create a video timeline simulation by configuring project name, tasks, dates, and visibility, then generate and share the video with baseline information and IFC model comparisons.

  • Asta Powerproject BIM

Requirements

  • Asta Powerproject basic knowledge is required
  • Building Information Modelling basic knowledge is required

Description

Asta Powerproject BIM enables you to plan, manage, construct and track projects in a digital and interactive environment.

During this Asta BIM course, we will discover how to link IFC model and model groups in Asta Powerproject and how to associate tasks with model elements. We will learn how to navigate model, create walkthroughs,  save views as images and take snapshots.

We will enrich model data with using custom properties. Splitting and merging objects option will enable you to arrange building elements according to your schedule.

We will create templates for BIM use in order to speed up the process of creating time based planning.

We will manage model revisions without losing data and link between the model elements and tasks in the schedule.

Ability of creating videos of timeline simulation with added fly pasts, you will be able to share the project and communicate with other stakeholders.

Finally, we will learn how to use 3D view to track progress highlighting differences between live data and baseline.

Who this course is for:

  • Project managers
  • Schedulers
  • BIM managers
  • Site managers