
Introduction to FAI and purpose of carrying out a FAI and when should FAI or partial FAI be performed.
Introduction to AS9102:2014 (BS EN 9102:2015) forms.
Understand the example part used to complete the FAI report pack in this training course.
learn about condition of supply and examples.
Learn how to use a FAIR process ‘check-sheet to complete the FAI pack.
Be able to fill in AS9102 B Form 1 – part number accountability.
Be able to fill in AS9102 B Form 2 – product accountability – materials, special processes, and functional testing
Be able to fill in AS9102 B Form 3 – characteristic accountability, verification, and compatibility evaluation and how to do Ballooned drawings with examples.
Able to fill in additional documentation to be added to the FAI Report pack.
understand material control and verification forms
Reviewing the most common faults found with a FAI report pack when submitting to customers.
Learn how to do a complete First article report pack to AS9102, First Article Inspection (FAI) is an essential part of quality control in aerospace manufacturing. Its purpose is to provide objective evidence that all engineering design and specification requirements are properly understood, accounted for, verified, and documented. The standard that governs this s AS 9102, the Aerospace Standard for First Article Inspection Requirements.